• 本文简单介绍了平移轨道施工、同步双向平移就位连接关键技术措施及施工步骤。

    The key techniques, include moving track, wall and column underpinning, two-direction synchronous moving, and linking with new foundation, were presented briefly in this paper.

    youdao

  • 介绍结构体系框架结构抽以及改造中的应用,并分析了方法的优点以及设计注意的问题。

    The paper presents the application of batten-plate beam structure in removal columns from frame structure and adding stories. It analyses the advantages and the notices in design.

    youdao

  • 通过预应力吊杆将楼面荷载转移梁上,安全地实现梁拔目的

    The purpose of transferring loads to the joist and wiping out the columns can be achieved safely.

    youdao

  • 乌古斯鲁尔关系塞尔帝国撒鲁尔的关系、撒鲁尔人安纳利亚土库曼斯坦的情况,本文作了简单的论述

    The relations between the Oghuz and the Salurs, the Seljuk Empire and the Salurs, and the activities of the Salurs in Anatolia and in todays Turkmenistan, are also discussed in this article.

    youdao

  • 提出哈尔滨市计生委办公楼结构改造所需基础相关连接构造设计思路方法

    Design thought and method of underpinning beam, column, foundation and relative joint construction in remodeling office building for Committee of Family Planning in Harbin are introduced.

    youdao

  • 介绍梁式转换结构实现上下层结构网改变截面结构受力复杂结构形式特点

    The structure features of bearing column girder transfer floor such as large section and complicated mechanical behaviors are introduced, which realize the transfer of structural axes.

    youdao

  • 通过实例计算分析,给出了带转换框架-核心结构转换上、下层间侧移角取值范围建议

    Base on the calculation of an example, suggestions on range of sideway ratio of stories up and down in transfer story of frame-core tube structure with column supporting transfer beam is obtained.

    youdao

  • 结合工程实例,介绍梁拔改造中的悬挂技术

    This paper introduced suspension technique application in structural reforming with jack beam and removing columns.

    youdao

  • 结果表明SRC转换结构破坏机制优于rc梁式转换层结构。

    The results show that the failure mechanism of SRC girder transfer floor is better than that of RC girder transfer floor.

    youdao

  • 结合综合大楼改造工程介绍高层框架结构抽改造设计有关概念设计构造处理方法及梁内力电算分析。可供类似工程参考。

    Based on an actual project of local demolition column, the concept design of multi-story building renovation, some detail construction and stress analysis of the trimmer are introduced.

    youdao

  • 有了这个外骨骼中的地方”,然后挂在建筑工地内

    With this "exoskeleton" in place, builders then hang joists and studs from the inside.

    youdao

  • 考察了不同比例乙醇流动、不同流速以及用不同醇酯化品酸酯在手性色谱的色谱行为。

    The influence of water proportion in mobile phase, flow rate of chromatography, derivatives of various kinds of alcohol were systematically examined.

    youdao

  • 针对高层结构梁拔工程进行简化建模提高非线性计算效率

    This paper analysed and introduced engineering techniques in the process of rebuilding, including joist and brace columns and structures reinforcement.

    youdao

  • 优化萃取条件上,洛尔与其结构相似的卡维地普萘洛尔得到了很好的分离

    Under the optimum extraction conditions, metoprolol and its structurally related compounds carvedilol and propranolol were separated primely on this kind of solid-phase column.

    youdao

  • 介绍了上部结构设计措施,基础抗浮底板外墙的处理方法。

    The design of cantilever beam, joist and battered column in the upper structure was introduced. The anti-float of deep foundation problem and baseplate and concrete external wall were introduced.

    youdao

  • 北京市音乐堂改扩建工程采用“两桩”的方法,转换结构传力体系,实现基础整体换,并增设了地下室,充分利用地下空间资源。

    By analyzing the loading acted on culvert, it is an effective way to use integral foundation in culvert on high embankment when the separated foundation is limited.

    youdao

  • 北京市音乐堂改扩建工程采用“两桩”的方法,转换结构传力体系,实现基础整体换,并增设了地下室,充分利用地下空间资源。

    By analyzing the loading acted on culvert, it is an effective way to use integral foundation in culvert on high embankment when the separated foundation is limited.

    youdao