结合施工现场的实际情况介绍了该挂篮构件的安装顺序,提出了安装过程中遇到的几个问题。
The installation order of the hanging basket's components according to the actual condition of construction field is introduced, Introduced and several problems in the installation are talded about.
基于2种不同张拉顺序的方案,计算出2种张拉顺序对构件应力和变形的影响,并对张拉顺序进行了优化。
With two different tensioning schemes, the influence of the tensioning sequence on stress and deformation is calculated and the tensioning sequence is optimized.
基于2种不同张拉顺序的方案,计算出2种张拉顺序对构件应力和变形的影响,并对张拉顺序进行了优化。
With two different tensioning schemes, the influence of the tensioning sequence on stress and deformation is calculated and the tensioning sequence is optimized.
应用推荐