部署这种体系结构不需要更改项目设置。
To deploy to this architecture, no project Settings need to be changed.
更改项目您需要得到认证。
说明如何更改项目模板中的编译器选项。
Explains how to change the compiler options in a project template.
检索更改项目的本地版本并与源版本和知识进行比较。
Local Version Retrieved for Change Items and Compared against Source Version and knowledge.
快速更改项目的顺序。
如果这是一个发布版本,您可以更改项目设置,使你产生。
If this is a Release build, you can change the project Settings so that you generate a.
可以更改项目的生成输出路径,以强制将所有输出放入同一个文件夹中。
You can change the build output paths of your projects to force all outputs to be placed in the same folder.
创建了项目后,要更改项目属性中的路径,使其指向Notes . jar文件。
After you create the project, change the path in the project properties to point to your Notes.jar file.
参与产品部门提出的工程更改项目的技术讨论,负责模具改造的供应商选择及实施。
Participate in technical discussion on ECN, select die supplier for die changes and track the change.
这个修订历史是有行为创建的,比如激活项目的安全性或者使之失效,更改项目的结构,等等行为。
The revision history is created by actions such as enabling or disabling project security, changing the project structure, and so forth.
如果在搜索项目或文件过程中单击“停止”,然后在搜索结果中更改项目或文件,所做更改不会立即显示出来。
If you click Stop during a search for items or files, and then make changes to items or files in the search results, the changes are not immediately visible.
在有些情况下,最好把变更请求当场一个新的项目,而不是更改项目变更单,特别是这个请求包含新的交付物的时候。
In some situations, it is better to treat the request as a new project, instead of a change order, especially if this request involves new deliverables.
从一个试验项目开始,并期望在进行过程中更改细节。
Start with a trial program, and expect to change the details as you go.
项目通常不会过多更改,因此这通常可以离线完成。
Items usually don't change much, so this often can be computed offline.
比较建模项目的不同版本之间的更改。
Compare changes between different versions of modeling projects.
点击OK以保存对项目属性所作的更改。
如果在部署描述符中做出更改之后构建项目,则构件将被缺省构件覆盖。
If you build the project after you've made changes in the deployment descriptor, the artifacts are overwritten with the defaults.
保存对项目的更改。
他们能够在测试或生产数据库上进行测试,而无需更改开发项目。
They can test drive on test or production databases without changing the development projects.
您不打算更改任何一个项目。
有严格的稳定性需求,数年之内没有更改计划的项目。
Those with extremely stable requirements, with no changes expected on the order of years.
作为一个工作单元,添加或合并因业务模型更改而产生的实现项目。
Addition or merging, as a unit of work, of implementation artifacts resulting from business model changes.
什么是部署项目、管理更改、提供支持和维护门户项目的流程?
What are the processes in place to deploy projects, to manage change, to provide support and maintenance to your portal project?
尽管本文的重点是应用程序更改,但要记住,SOA支持项目的成功依赖于所有三种类型的更改。
Although this article focuses on application changes, bear in mind that the success of an SOA enablement project depends on changes of all three kinds.
然后重新打开项目,以确保应用了更改。
You then need to reopen the project to ensure your change is applied.
有时候,更改了项目的部署描述符后,服务器可能不会注意到这个更改。
Sometimes, when changing a project's deployment descriptors, the server may not notice that a change has been made.
内联跟踪:在这种方法中,项目的更改跟踪信息在做出更改时更新。
Inline tracking: in this method change tracking information for an item is updated as the change is made.
您将看到多个工作区更改,表明您自从最初导入项目交换以来已对工作区做出了更改。
You will see several workspace changes, indicating that you've made changes to the workspace since you first imported the project interchange.
管理更改失败会增加没有按预期发生更改的风险,它将危及项目的成功。
Failure to manage change increases the risk of the change not happening as expected and it jeopardizes the success of the project.
导入配置之后,对项目稍作更改,仅应用能降低总部署时间所需的配置。
After importing the configuration, you will slightly modify the project to apply only the necessary configuration to reduce the overall deployment time.
应用推荐