• 满足项目相关施工验收规范招标人要求。

    Acceptance specification of relevant construction and tenderees' requirements are met.

    youdao

  • 施工验收表面平整光洁色彩一致明显色差

    Construction acceptance: surface shall be level and smooth, of unified hue, no clear color deviation.

    youdao

  • 7质量要求:满足项目相关施工验收规范招标人要求。

    Quality requirements: acceptance specifications of relevant construction and tenderee's requirements are met.

    youdao

  • 钢筋安装必须结合图纸设计规范施工验收规范进行

    Re-bar installation should be carried out in accordance with the drawing, design code and construction taking-over specification.

    youdao

  • 工程设计参数施工质量控制施工验收评定主要依据

    Is engineering design parameter, start construction quantity control, start construction to check before acceptance to assess of main basis.

    youdao

  • 管道安装进行压力试验施工验收规范要求要对管道膨胀进行临时约束

    In accordance with construction acceptance specification, temporary restraint is to apply to the expansion joint on pipeline at pressure test after pipe installation.

    youdao

  • 偶极子属于高压直流电法的一种,具有操作简便费用低廉,可操作性强,能对防渗层进行百分之百的无损检测,已成为防渗层施工验收采用的主要方式。

    The dipole method, which utilizes high-voltage direct current, is a simple, low-cost, and highly workable method to fully detect the liner without destruction.

    youdao

  • 本文通过对比G B压力管道不同施工验收规范焊接质量控制条款,分析差异性合理性,提出当设计图纸同时根据几个施工验收规范时,施工单位应注意的问题。

    By comparing the different construction and acceptance codes of welding quality control of GB pressure pipes, this paper focuses on the analysis of their differences and rationality.

    youdao

  • 使用火灾报警系统单位测试火灾探测器报警功能安装施工工程单位安装验收过程必备之工具

    For the use of fire alarm system, fire detector alarm unit testing and installation of construction engineering units during the installation and acceptance of the tools is necessary.

    youdao

  • 施工进行工序书面技术交底参加各工序检验工程验收工程的分部分项工程进行质量检查评定工作。

    Written technical disclosure of each process in the construction, to participate in the inspection and project acceptance process, quality inspection and assessment of sub projects.

    youdao

  • 商业潜水员进行水下施工验收搜索打捞修复摄影等相关活动

    Commercial divers perform underwater activities related to construction, inspection, search, salvage, repair and photography.

    youdao

  • 竣工验收之前根据规定提交资料份数提前整理好桩基施工的成套资料,所有必须签署姓名的地方不得遗漏。

    Prior to completion and acceptance of works, sets of data on pile foundation construction shall be prepared early and signatures of name can not be lost according to the copies of documents submitted.

    youdao

  • 施工单位应当工程竣工验收合格建设单位提供下列技术资料

    Following technical materials should, by contractor on the date of project completion acceptance, be provided to employer.

    youdao

  • 指出公路项目质量管理必须以下四个阶段抓起即项目决策阶段设计阶段、施工阶段、交工竣工验收阶段。

    The quality management Muse be take from four side as follow; project decision making stage, design stage, construct stage and finish check and accept stage in our province.

    youdao

  • 参与招标施工全过程包括协助提供参考报价审核招标文件评估供货商监督工程质量验收

    Participate all the bidding and implementation process, includes provide quotation reference, assist reviewing bidding document, evaluating contractors, monitoring engineer quality, inspection, etc.

    youdao

  • 负责工程项目工程施工准备开始直至验收交工,以及签证结算全过程施工管理工作

    Responsible for the project from construction preparation to completion acceptance, the whole process of construction management and settlement.

    youdao

  • 施工过程特别注意重要环节材料进场验收隐蔽工程验收

    Pay special attention to the construction process is an important component of the project materials approaching acceptance and covert acceptance.

    youdao

  • 本文主要介绍混凝土结构工程施工验收规范修订情况及主要修改内容

    This paper introduces the revision and main revised contents of the national code for construction and acceptance of concrete building structures.

    youdao

  • 因此,合理检验验收水平当前正常施工质量水平适应。

    So, the accepting level of inspection lot should be in accordance with the quality level of current construction.

    youdao

  • 防火涂料系统管理包括产品质量选用施工验收使用环节的管理。

    The management of the fire coating includes the management of product quality, choice and construction, acceptance and usage of the product etc.

    youdao

  • 水利工程建设项目经历项目决策设计施工竣工验收等几个阶段。

    The construction of water project need to go through project decision, design and construction with is completed check and accept.

    youdao

  • 施工部分:与水压有关项目施工完毕验收合格。

    Construction: projects concerning water pressure are completed and passed the test.

    youdao

  • 规范适用大量发电厂热工自动化工程施工验收工作

    This specification is applied to the construction and acceptance work for heat power engineering automation project in power plant.

    youdao

  • 总结完整的施工质量验收流程作为现有规程补充

    And a complete construction quality acceptance process is set up as a supplement to the existing specification.

    youdao

  • 领导管理整个喷粉线项目包括参与项目的前期导入、施工安装调试改进验收全过程

    Lead and manage the whole painting line project , include attending the launching / manufacture/ installation/commission/improvement/acceptation …etc. the whole process .

    youdao

  • 建筑涂饰工程施工验收规程建筑涂装重要标准

    "Code for construction and quality acceptance of building painting engineering" is a important standard of building painting.

    youdao

  • 接地装置隐蔽工程设计施工验收各环节均需严格规范,对此进行了阐述分析。

    Analyzes the normalization of grounding installation project from design, construction and inspection, assures project quality.

    youdao

  • 声学独创的“管家服务项目立项科研阶段-项目设计阶段-项目施工阶段-竣工验收阶段。

    The "Sound Steward" service ZISEN pioneered covers every phase from project approval, investigation, design, construction, completion and acceptance.

    youdao

  • 该文宋跳河桥桥头地区,对粉设计施工验收注意事项探讨

    Taking bridge head area of Songtiao River for example, discussion has been made hereby on key points of the design, construction and acceptance of cement mixed pile.

    youdao

  • 该文宋跳河桥桥头地区,对粉设计施工验收注意事项探讨

    Taking bridge head area of Songtiao River for example, discussion has been made hereby on key points of the design, construction and acceptance of cement mixed pile.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定