• 大多数建筑现在2个不同施工阶段

    Most building pieces now have 2 different stages of construction.

    youdao

  • 施工阶段最大项目

    Construction is the largest phase in the project.

    youdao

  • 监理风险分析施工阶段运用作了介绍

    In this paper the application of supervision risk analysis in construction stage is analyzed.

    youdao

  • 显而易见的就是19处主要体育场馆仍处在施工阶段

    Most visibly, 19 main sports venues are construction sites.

    youdao

  • 具有初步行动能力里程碑标志年底施工阶段

    The Initial Operational Capability Milestone marks the end of the Construction phase.

    youdao

  • 1线(黄岛段)全面进入车站主体施工阶段

    Line No. 1 (Huang Daoduan) also entered the construction phase of the main station.

    youdao

  • 输管道风险管理施工阶段模糊综合评价

    Long Pipeline; Risk Management; Construction Phase; Fuzzy Aggregative Risk Assessment.

    youdao

  • 施工企业成本控制关键在于施工阶段成本控制。

    The construction company's cost control lies in the cost control of the construction phase.

    youdao

  • 建筑工程施工阶段造价控制重点在于成本控制

    The construction phase of the construction cost control, focus on cost controlling.

    youdao

  • 针对这些问题,本文提出施工阶段成本控制方法

    Targeted at these problems, the cost control method in the construction phase is proposed.

    youdao

  • 本文阐述了污水处理厂施工阶段沉降观测主要技术设计

    This paper describes settlement observation technology design in the sewage treatment works construction stage.

    youdao

  • 特殊施工阶段实施24小时连续作业,工人工作实行三班

    In special construction stage, 24 hours continuous work will be executed and three-shift work system to be carried out.

    youdao

  • 我国目前建设项目监理,基本上只是进行施工阶段的监理。

    The current supervision of construction project in our country only supervises construction phase.

    youdao

  • 目前我国施工企业施工阶段成本控制存在许多问题

    But now, there are still many problems in the cost control during the construction phase for Chinese construction enterprises.

    youdao

  • 目前我国施工企业施工阶段成本控制存在许多问题

    But at present, the cost control in the construction phase of China construction enterprises still have many questions.

    youdao

  • 附图当前施工阶段平面布置图现场布置变动时会加以更新。

    The drawings illustrate the plan layout used in the current construction stage. The site layout will be updated with changes.

    youdao

  • 南京长江过江通道工程施工阶段测量方法进行了设计分析

    Design and analysis of the survey methods in the construction period of Yangzi River channel of Nanjing.

    youdao

  • 施工阶段成本控制施工企业能否有效进行项目成本控制的关键

    The cost control in the construction phase is the key for construction enterprises effectively control project cost control.

    youdao

  • 本文结合施工阶段管理对策系统论述施工现场管理策略方法

    According to the construction stage management countermeasure system is discussed, the construction site management strategy.

    youdao

  • 建筑施工企业能否有效控制项目成本关键控制施工阶段的成本。

    The cost control in the construction phase is the key whether the construction enterprises can effectively control the project cost.

    youdao

  • 习惯全文使用情况施工阶段开始成为新的迭代

    It is customary to write full text use cases during the construction phase and each one becomes the start of a new iteration.

    youdao

  • 本文以工程项目施工阶段质量控制研究主题进行了较为系统的研究。

    The project to the construction phase quality control for research themes in a more systematic research.

    youdao

  • 提出建设项目施工阶段到竣工阶段造价控制有效途径和方法。

    Propose the effective way of controlling the cost of construction project from the construct stage to the very end of the project.

    youdao

  • 集团安徽第一房地产项目-合肥蜀山名筑”目前正在施工阶段

    Group in Anhui, the first real estate project - Hefei "Shushan FuturArc" currently in construction phase.

    youdao

  • 最后制定阶段成果一个计划(包括成本进度估计数)的施工阶段

    The final Elaboration phase deliverable is a plan (including cost and schedule estimates) for the Construction phase.

    youdao

  • 实践证明,运用质量控制动态模式施工阶段控制工程质量最有效方法

    The practic proved that the dynamic quality control model is an effective method for project quality control during construction.

    youdao

  • 传统施工企业成本计算方法不能正确客观反映出企业施工阶段实际消耗

    The traditional methods of construction enterprises can not correctly reflect objectively the actual consumption of the construction phase.

    youdao

  • 水利工程施工企业施工阶段成本控制一个非常复杂问题涉及内容很多

    Cost control is a very complex issue in the construction phase for the water conservancy construction enterprise which involves many contents.

    youdao

  • 因此桥悬臂施工过程进行有限元计算,分析了各个施工阶段应力状态

    Three dimension finite element method is used to calculate the stress state of the cantilever during each construction stage.

    youdao

  • 因此桥悬臂施工过程进行有限元计算,分析了各个施工阶段应力状态

    Three dimension finite element method is used to calculate the stress state of the cantilever during each construction stage.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定