• 贫化取决于参数

    The ore dilution rate depends on the ore drawing parameters.

    youdao

  • 振动技术正在我国许多推广

    The vibrating ore drawing technique is being popularized presently in many mines in our country.

    youdao

  • 可以解决各种边界条件下放矿问题

    It can solve ore-drawing problems with various boundary conditions.

    youdao

  • 本文应用了所研究结果,解释了一些放矿问题

    This paper has applied the above results and explained some drawing problems.

    youdao

  • 自然崩落基本上都覆盖岩层进行的。

    The process of ore- drawing in block caving is completed under overburden.

    youdao

  • 系统适合大规模阶段块崩落放矿生产管理

    The system is suitable for ore-drawing management of high level and large drawing area of block caving system.

    youdao

  • 随机介质理论可以很好地反映崩落移动规律。

    The stochastic medium theory of ore-drawing can properly reflect the movements of ore and rock masses for caving system.

    youdao

  • 镜铁山研究了无贫化放矿方式应用若干问题

    Taking Jingtieshan Mine as an example, the peper deals with several problems with applying non-dilution ore drawing mw thod.

    youdao

  • 检验结果表明只有椭球理论全部通过连续流动检验

    The result shows that only the similar ellipsoid drawing theory can pass all the verification.

    youdao

  • 探讨了无底柱分段崩落规律分析了造成损失贫化原因

    This paper discusses the law of the ore drawing about Sublevel Caving Mining, and analyzes the reasons for the dilution and loss.

    youdao

  • 为此研究过程中多方石混入贫化损失形成机理

    Therefore, the mechanism of dilution and loss formation in a side drawing process involving wastes coming from various directions is studied.

    youdao

  • 据此计算截止官庄放矿提供了科学依据。

    According to this cutoff grade, the paper has calculated the ratio of ore and rock while cutoff drawing that provide science foundation for the drawing of Xiaoguanzhuang iron mine.

    youdao

  • 理论正确性质体调速式振动放矿的试制中得到了证明。

    The correctness of the theory has been verified in the testing of the dual mass vibrating feeder.

    youdao

  • 据此计算截止小官庄放矿提供了科学依据。

    According to this cutoff grade, the paper has calculated the ratio of ore and rock while cutoff drawing that provide science fo...

    youdao

  • 获取技术经济指标基础上,截止放矿品位进行了优选政策。

    Based on the technical and economical index, an optimal decision for the cutoff grade of ore drawing is presented.

    youdao

  • 一旦发生放矿井堵塞,严重影响正常生产乃至于造成停产

    Once orepass block happens, the normal operation of the mine would be seriously influenced, even resulting in operation stop.

    youdao

  • 采用无底柱分段崩落国内外一直采用截止品位控制

    Cut-off grade method has been used to control the ore drawing in non-pillar sublevel caving mining both in and outside China.

    youdao

  • 研究指出:在过程中,将崩落接触视为理想界面不正确的。

    It shows that the contact face between ore and waste as a ideal interface is incorrect during drawing.

    youdao

  • 研究发现相同条件下,平面放矿方案立面放矿方案更加合理

    The research found out that under the same ore-drawing conditions, the former was more reasonable than the latter.

    youdao

  • 实践证明采场出口散体速度分布出口尺寸放矿结果显著影响

    The practice shows that the flow velocity of bulk ore rock at the stope drawpoint and the dimensions of drawpoint have remarkable influence on the drawing effect.

    youdao

  • 认为下盘位置倾角截止品位、围岩含品位有着密切关系。

    It is concluded that location of foot-wall drawing points are closely related to orebody dip, cut-off grade and ore grade of wall rock.

    youdao

  • 放矿计算机模拟再现采场放矿实际理想管理条件模拟结果加以比较

    The computer based drawing program was used to simulate and reproduce the real drawing cases in stope in order fo compare it with the simulation obtained under ideal control of drawing.

    youdao

  • 综合分析现场情况根据散体流动规律理论提出了溜井改造技术方案

    Proposals for technical renovation of the raise were suggested based on a comprehensive analysis of the field situation and according to the bulk flow rule and ore draw theory.

    youdao

  • 该项成果进一步完善理论应用体系,使山管理科学化向前迈进进了一大步

    This achievement has perfected the ore-drawing theory and application field and has advanced a significant step forwards t...

    youdao

  • 贫化推广应用对于实行无底分段崩落具有一定社会价值经济价值。

    Population and application of the dilution ratio ore drawing method has certain social value and economic value for implementation of the sill pillar-free subdrifting method.

    youdao

  • 采场顶柱作为永久损失,采场底柱、间柱等采场大量完毕,一次性进行回收

    The crown pillar of stope is permanent loss and not recoverable, while sill pillar and barrier pillar shall be recovered after the ore drawing work is completed.

    youdao

  • 本文利用崩落移动规律进行覆盖控制这一放矿理论应用课题进行探讨

    The paper approached the subject of the application of draw theory which utilizes the movement rule of caved rock to control ore-drawing under overlying rock.

    youdao

  • 粘结料时常出现放矿障碍,一类稳定粘结卡堵,一类是形成管流动

    There are two kinds of hindrances to cohesive ores during ore drawing. One of them is stable stick arch and the other rathole flow.

    youdao

  • 不能一步到位地施行无贫化放矿时,可用贫化放矿逐渐提高截止品位趋向无贫化放矿

    When dilutionless drawing cann't be executed in one step, low dilution drawing can be used and the cut-off grade can be gradually raised towards dilutionless drawing.

    youdao

  • 研究振动转载主要技术性能参数、转载站结构特点工业试验取得指标进行了论述。

    The main technical performance data of the transfer station of vibrating ore drawing under research, its structural characteristics and the performances achieved in its industrial test are discussed.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定