每次重用线程时,都必须更改线程的上下文,对于可能很少在这些线程执行活动的应用程序,开销会特别大。
The context of the thread must be changed each time the thread is reused, which can cause a significant overhead to applications that may be doing very little activity on those threads.
你可以在设置里面更改线条的颜色。
更改线程池中的最大线程数时需谨慎。
Use caution when changing the maximum number of threads in the thread pool.
在带外 (OOB)调试事件期间,应该从来都不需要修改线程的上下文。
You should never need to modify the context of a thread during an out-of-band (OOB) debug event.
采用平面二维水流泥沙数学模型计算了赣江大堤南昌段堤线改线对河段水流运动及河床冲淤的影响。
By using a 2-d sediment mathematical model, influences of riverside relocation of Nanchang reach of Ganjiang river on flow, scouring and silting were computed.
采用平面二维水流泥沙数学模型进行堤线改线影响计算,模型考虑了悬移质及推移质泥沙运动、桥渡及料场的阻力变化。
The2-D flow and sediment mathematical model is used to compute the effect of the engineering of riverside embankment change.
采用平面二维水流泥沙数学模型进行堤线改线影响计算,模型考虑了悬移质及推移质泥沙运动、桥渡及料场的阻力变化。
The2-D flow and sediment mathematical model is used to compute the effect of the engineering of riverside embankment change.
应用推荐