• 讨论具有连续资源单机排序问题

    The single machine scheduling problem with continuous resources is discussed.

    youdao

  • 排序问题性能测度排序长度

    The performance measure of the scheduling problem is schedule length.

    youdao

  • 本文主要考虑平行在线排序问题

    This paper studies semi online parallel machine scheduling problems.

    youdao

  • 给出参数可控排序问题一个综述

    A survey on scheduling problems with controllable parameters is given.

    youdao

  • 研究了工件可拒绝排序问题

    A scheduling problem with rejection has been researched.

    youdao

  • 最小化加权完工时间单机排序问题

    Minimize the total weighted completion time single machine scheduling problems.

    youdao

  • 本文考虑传递时间平行排序问题

    This paper considers the parallel machine scheduling problem with delivery times.

    youdao

  • 流水作业排序问题

    Flow shop scheduling problems.

    youdao

  • 现在研究如何动态规划方法求解排序问题

    This thesis deals with how to solve this type of schedule problem in dynamic programming.

    youdao

  • 因素处理采用了不完全信息排序问题作法

    In order to treat various factors, an arranging method is applied to the incompleted information.

    youdao

  • 方法有效地解决对敌空中目标威胁评估排序问题

    This method resolves the problem of threat assessment and threat sorting to the enemy air attack targets efficiently.

    youdao

  • 讨论空中交通流量管理中在航路交汇点上飞机排序问题

    The aircraft sequencing problem of route intersection in air traffic flow management was discussed.

    youdao

  • 本文讨论分段恶化排序问题资源约束的恶化排序问题

    In this thesis, we study the single machine step-deterioration scheduling problem and the single machine deteriorating scheduling problem with resource constrain.

    youdao

  • 排序问题最新研究主要集中扩展模型实际约束上

    The recent developments in scheduling theory have focused on extending the models to include more practical constraints.

    youdao

  • 因此排序问题研究具有广泛实用价值重要理论意义

    Therefore, for both practical and theoretical reasons, sorting is probably one of the most widely studied problems in computer science.

    youdao

  • 目的研究解决元素为三角模糊互补判断矩阵排序问题方法

    Aim To study new ranking methods of ranking problem on complementary judgment matrix with triangular fuzzy Numbers.

    youdao

  • 序列翻转对换排序问题基因组比较中的应用受到关注。

    The problems of sorting strings by reversals or by transpositions have been studied because of their applications to genome comparison.

    youdao

  • 研究了可中断的带有到达时间的使总完工时间最小的恒排序问题

    A preemptive uniform machine scheduling problem with arrival time and minimum makespan is studied in this paper.

    youdao

  • 这些现代排序问题经典排序问题更为复杂,绝大多数都是NP-难问题

    The modern scheduling problems are more complex than classical scheduling problems, most of which are NP-hard problems.

    youdao

  • 结果表明,提出算法至少可以求解25个工件规模的越库配送排序问题

    The computational experiments show that the proposed DP algorithm can handle problems up to at least 25 jobs.

    youdao

  • 允许作业柔性加工的基础上,本文提出一种新的目标机器加工排序问题

    In this paper, we propose a new machine process sequencing problem with two objectives considering the operation flexibility.

    youdao

  • 对于两个模糊排序问题,模糊效用函数自动退化相应的模糊优先关系

    When there exist only two fuzzy sets, the fuzzy utility functions are reduced automatically to corresponding fuzzy preference relations.

    youdao

  • 通过分析飞机运行的时区集合特点,将飞机调度问题转化为固定工件排序问题

    In order to solve airline aircraft dispatching problem which is NPC problem, time intervals which aircraft processes are analyzed.

    youdao

  • 为了解决含有模糊特征工作流任务排序问题,提出了一种工作流任务排序模型。

    To solve the tasks ranking issue with fuzzy characteristics in workflow, a tasks ranking model in workflow was proposed.

    youdao

  • 研究具有链式约束单机随机排序问题,目标函数为加权完工时间的数学期望。

    This paper discusses the stochastic scheduling on a single machine to minimize total weighted completion time subject to precedence constraints of chains.

    youdao

  • 给出板坯排序问题约束满足模型设计了基于约束满足启发式混合求解算法

    A constraint satisfaction model is given. A hybrid solving algorithm is designed based on constraint satisfaction and heuristics node exchange algorithm.

    youdao

  • 应用实例研究运用矩阵柔性管理方法,计算山区经济开发主要因素排序问题

    In this paper, we present an application of the matrix flexibility management method, which is a sequencing of main factors in the development of mountain area economy.

    youdao

  • 由于抓钩排序问题直接影响这些系统生产率安全性,因此,必要对此进行研究

    Since the production rate and safety of the system are affected by the hoist scheduling, it is necessary to study the hoist scheduling.

    youdao

  • 由于抓钩排序问题直接影响这些系统生产率安全性,因此,必要对此进行研究

    Since the production rate and safety of the system are affected by the hoist scheduling, it is necessary to study the hoist scheduling.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定