介绍了可换索体系对各组成部分的要求。
This paper introduces requirements of replaceable tendon system.
最后,换索后索力、位移基本恢复到换索前状态。
At last, the cable force and displacement of the bridge is basically returned pre-condition.
结合犍为岷江大桥换索工程,探讨斜拉桥换索施工监控中的技术问题。
With reference to the cable replacement construction of Qianwei Minjiang River Bridge, the construction monitoring techniques involved in the cable replacement are studied.
结合犍为岷江大桥换索工程,探讨斜拉桥换索施工监控中的技术问题。
With reference to the cable replacement construction of Qianwei Minjiang River Bridge, the construction monitoring techniques involved in the cable replacement are studied.
应用推荐