• 采用大变形几何非线性有限元分析强夯加固机理及其振动环境影响。

    The geometric nonlinear finite element method is used to analyze the impact mechanism of dynamic compaction.

    youdao

  • 以往振动水冲只是一种加固地基的方法。

    The vibroflotation was a method only for strengthening foundation before.

    youdao

  • 分析了加固过程振动加速度孔隙水压力变化特性

    The vibration acceleration and the dynamic pore-pressure developing properties in the process of shaking and jetting reinforcement are analyzed.

    youdao

  • 地基采用强夯加固强夯地基上打桩、振动碎石混凝土灌注桩多种地基处理方法。

    The method includes the forced ram, piles driving on the ramed ground, vibrating crushed stones piles and injecting concrete piles etc.

    youdao

  • 基础上找到了引起结构振动主要振动结构后继加固改造提供关键信息

    The main vibration sources causing the vibration of the structure, which will provides key information for the strengthening, are found.

    youdao

  • 探讨振动冲击环境LCD显示屏加固技术,也是应予关注的课题。

    This article discusses the ruggedization technology about the LCD panel under the vibration and shock environment.

    youdao

  • 它们交叉加固使具有的刚度足以承受汽车行驶过程受到的冲击、碰撞、扭曲振动

    Cross Bracing makes them rigid enough to withstand the shocks, Blows, twists, and vibrations they meet in operation.

    youdao

  • 根据龙潭水库地质条件,选用振动防渗板墙进行防渗加固

    The vibration and sinking-mould plank wall of seepage prevention is a new technique to mould continuous wall of seepage prevention underground by injecting slurry and sinking mould.

    youdao

  • 振动防渗板墙技术近几年引入水利工程中进行地基防渗加固技术。

    In recent years, the vibration sinking mould cutoff panel wall is introduced to the hydro project, which is the new technology to strengthen the foundation anti-seepage.

    youdao

  • 这种重型无框解析系列振动冲击能够高达200摄氏度加固噪声不受外界大部分工业污染物

    This heavy duty frameless resolver series is ruggedized against vibration and shock, able to operate up to 200 C, resistant to noise, and impervious to most industrial contaminants.

    youdao

  • 用于抗震加固能减震结构进行塑性时程分析研究,主要解决以下几个问题确定结构振动模型

    The elastic-plastic time history analysis on seismic retrofitting of the energy dissipation structures is researched, mainly solved following several problems: Definite structure vibration model;

    youdao

  • 通过增设支撑进行加固解决了斜振动问题保证生产正常进行。

    After the supports were added and reinforced, the problem of oscillation of charging bridge has been settled, and it can ensure production on the rails.

    youdao

  • 某丙建成投产,在煮糖过程发生明显振动,经过结构加固,虽振感减轻仍然不能达到令人满意效果。

    Obvious vibration occurred in a new triose producing building in the process of boiling sugar. After reinforcement, the vibration of the building had been reduced, yet, the result was not satisfied.

    youdao

  • 利用MRD对一有损伤钢筋混凝土-剪偏心结构进行抗震加固,并进行振动试验

    The shaking table experiment of seismic retrofitting of earthquake damaged RC frame shear wall structure using MRD is implemented.

    youdao

  • 研究结果表明:振动现浇混凝土管桩技术高等级公路软基加固中的高效经济的新技术。

    So the field pour concrete cased pile with vibrated steel tube mould technology is an effective and economical technology for soil improvement.

    youdao

  • 研究结果表明:振动现浇混凝土管桩技术高等级公路软基加固中的高效经济的新技术。

    So the field pour concrete cased pile with vibrated steel tube mould technology is an effective and economical technology for soil improvement.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定