据此讨论了最大浑浊带与拦门沙的关系。
The relationship between the turbidity maximum and the river mouth bar is discussed.
在主航道交通繁忙的条件下进行水下爆破以炸除拦门礁。
An underwater blasting to explode the submerged reefs was performed in the condition of heavy traffic on the main channel.
最大浑浊带中心处泥沙浓度趋于增大,但口门拦门沙处泥沙浓度趋于减小。
The sediment concentrations of turbidity maximum zone tends to be higher, but the sediment concentration at sand bar tends to be lower.
因上游来沙量增加,在最大浑浊带中心和河口拦门沙处悬浮泥沙浓度趋于增加。
The suspended sediment concentration at the center of the turbidity maximum zone and near the sand bar tends to increase because of the sediment addition from upstream.
外拦门沙是经梅花水道合流和铁板沙过滩水流分流后川石水道远端泥沙扩散的产物。
The Outer Bar is product of the distant silt divergence from the confluence of the Meihua Channel and the distributary of phe currents flowing over the Teibansha Shoal.
长江口是巨型多沙河口,其特有的水沙运动特点,形成了长达数十公里的拦门沙区段。
The Yangtze River estuary is a large heavily sediment-laden estuary where the bar shoal with dozens of kilometers in length is formed due to its unique feature of water-sediment movement.
应用近几年的水文和地形实测资料,研究了磨刀门拦门沙区域近期的动力和地貌演变特点。
Hydrographic and bathymetric data have been applied to review the dynamic regime and morphological evolution in recent years in the sandbar area of the Modaomen estuary.
在河口与海洋交汇的河口地区都存在着一定范围的拦门沙浅滩,成为大型船舶通海航道的碍航区段。
In the convergence zone of the estuary and the ocean, there always exists the bar shoal which has become an obstacle to navigation for the large-scale vessels in seaward channel.
沉积环境可划分为河口主槽沉积环境、涨潮流沉积环境、浅滩沉积环境、拦门沙坝沉积环境及河口前缘沉积环境。
The dynamic sediment environment is divided into different areas that consist of estuarine deep trough, flood current, Jiaobeisha shoal, estuarine sandbar and seashore outside estuary.
通过分析灌河口附近海域的泥沙运动特点,采用经验公式从定性和定量两个方面对灌河口拦门沙整治工程后的岸滩演变进行了预报。
By analyzing the sediment movement characteristics, we use the selected empirical formulas to forecast the coastal evolution after the regulation project in Guanhe estuary.
没有拦得住他的门,没有挡得住他的锁,就是银行的保险锁他弄根芹菜就能把它捅开了了。
Has not blocked lives his gate, could not have blocked his lock, was the bank insurance locks him to make the root celery to be able to hold it.
三门峡水库建成后,先后采用了蓄水拦沙、滞洪排沙和蓄清排浑调水调沙三种运用方式,水库在运用过程中也相应的分为三个阶段。
The Sanmenxia Reservoir, located in the middle reaches of the Yellow River, has passed three stages since it was built up in 1960.
三门峡水库建成后,先后采用了蓄水拦沙、滞洪排沙和蓄清排浑调水调沙三种运用方式,水库在运用过程中也相应的分为三个阶段。
The Sanmenxia Reservoir, located in the middle reaches of the Yellow River, has passed three stages since it was built up in 1960.
应用推荐