• 最后操作叫“”,它使道就位于河床下面

    This final operation is the"pullback"and installs the line pipe under the river.

    youdao

  • 深海采矿扬矿处于海洋环境之中,受海浪海流以及采矿的影响,会发生的偏移。

    Deep ocean mining pipe has a large deflective displacement under the wave, currents and dragging by mining vessel in ocean environment.

    youdao

  • 水平定向穿越环节,容易出现现象导致穿越失败,造成巨大的经济损失

    Pipe sticking phenomenon appears sometimes during pull-back stage of pipeline crossing with horizontally directional drilling, which results in crossing failure and great economic loss.

    youdao

  • 为了解决问题动态注水平衡技术应运而生

    In order to solve this problem, the dynamic water injection balance technique is developed.

    youdao

  • 地上搬运要注意使的外部损伤。

    Make sure not to get any pipes surface hurt when carrying on groud.

    youdao

  • 他们第一个产品跳转针对小型企业销售产品创建内容形式,都是通过独特的下降减少接口应用

    Their first product, PipeJump, is a sales tracking application for small businesses, which creates a unique interface through reduction of form elements and drag-and-drops.

    youdao

  • 他们第一个产品跳转针对小型企业销售产品创建内容形式,都是通过独特的下降减少接口应用

    Their first product, PipeJump, is a sales tracking application for small businesses, which creates a unique interface through reduction of form elements and drag-and-drops.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定