以水下浇筑大桥承台和采用挂篮法施工多跨连续箱梁结构是浙江富阳大桥工程的重头戏。
Underwater placement of bridge's platform and cradle construction method for multi-span continuous box-girder structure constitute the construction feature of Fuyang bridge in Zhejiang province.
TB真空循环脱气装置设备的基础是承载上部荷载的桩基承台钢筋混凝土结构。
Bearing upper load, a reinforced concrete structure with a pile foundation is the foundation of RH-TB vacuum recycling degassing installation.
特大型桥梁的锚体或承台都是全桥的主要承重结构的基础,基坑的封底质量关系全桥的使用寿命和安全。
Extra large body of bridge bears the whole main bearing foundation of structure of bridge, service life and security of the whole bridge of back cover quality relation of the foundation pit.
杭州湾跨海大桥南航道桥主塔承台为哑铃形结构,平面尺寸大。
The pylon bases of the south channel bridge of Hangzhou Bay Sea-Crossing bridge are designed in shape of dumbbell structures that are extraordinarily large in plan.
本文利用基础JC CAD软件承台桩设计参数的修改,解决补桩后上部结构形心与桩基形心不重合时桩基承台的计算问题。
In this paper, based JCCAD software design parameters of pile caps changes, After the upper structure to solve piling centroid centroid do not coincide with the pile when the pile cap computation.
主塔基础采用分离式承台钻孔桩基础,两承台设横系梁连接,系梁为预应力混凝土结构。
The foundation of the pylon is composed of bored piles and separate pile caps connected with prestressed concrete tie beams.
应用三维有限元分析,采用增量计算方法,对某围堰工程承台钢板桩围护结构进行了动态施工力学的三维数值模拟。
The staged construction mechanics of the steel sheet pile retaining structure for a cofferdam project are numerically simulated using 3D FEM incremental computing method.
应用三维有限元分析,采用增量计算方法,对某围堰工程承台钢板桩围护结构进行了动态施工力学的三维数值模拟。
The staged construction mechanics of the steel sheet pile retaining structure for a cofferdam project are numerically simulated using 3D FEM incremental computing method.
应用推荐