主塔基础采用分离式承台钻孔桩基础,两承台设横系梁连接,系梁为预应力混凝土结构。
The foundation of the pylon is composed of bored piles and separate pile caps connected with prestressed concrete tie beams.
以水下浇筑大桥承台和采用挂篮法施工多跨连续箱梁结构是浙江富阳大桥工程的重头戏。
Underwater placement of bridge's platform and cradle construction method for multi-span continuous box-girder structure constitute the construction feature of Fuyang bridge in Zhejiang province.
柱式桥墩由承台、柱式墩身和盖梁组成,墩柱是桥墩的重要组成部分。
Column pier is made up of pile cap, pier body and cap beam, pier column is an important part of the pier.
通过对工程实例的剖析,介绍桩底后注浆和扩大承台(梁)法等桩基事故处理方法和原理,作为工程实践经验的总结。
Through the analysis of pile bottom grouting and beam expanding accident methods and principles, the engineering practical examples are summarized.
柱式桥墩由承台、柱式墩身和盖梁组成,墩柱和桩基是桥梁的重要组成部分。
Column pier comprised pile cap, pier body and cap beam, pier column and pile found is as an important part of the bridge.
在考虑地下室基础承台刚域及抗拔桩布置的情况下,对基础梁的弯矩计算进行分析推导,得出了跨中弯矩的折减系数计算公式。
Moments on basement foundation beams considering rigid zone of pile caps and pulling resistance of piles are analyzed. Reduction factor of midspan moment is gained.
在考虑地下室基础承台刚域及抗拔桩布置的情况下,对基础梁的弯矩计算进行分析推导,得出了跨中弯矩的折减系数计算公式。