刘浩是月光镇至南京高铁的总工程师。
Liu Hao is the chief engineer of the high-speed railway connecting Moonlight Town to Nanjing.
“我们将建立更多的信息和技术中心,以改善基础数据和大数据,并将 5G 和北斗卫星导航系统等技术应用于该领域。”农业农村部信息中心的副总工程师韩福军说。
"More information and technology centres will be built so that basic data and big data can be improved, and technologies like 5G and the BeiDou Satellite Navigation System can be used in the field," said Han Fujun, Deputy Chief Engineer of the Information Center of MARA.
总工程师来到会场,随身带着个大皮包。
The chief engineer came to the meeting, carrying a big portfolio along.
他接着说他从来没想到总工程师会亲自来。
He continued that he never thought that the chief engineer himself would come.
该公司恢复了他的总工程师职务。
他被释放并恢复总工程师职务。
总工程师的秘书代表总工程师参加了会议。
The chief engineer was represented at the meeting by his secretary.
我想净工资就是扣款以后的总工资。对吗?
I guess net pay is the total pay after deductions. Is that correct?
该分区中员工的总工资。
下一步是确定和每个组相关的总工作量需求。
The next step is to identify the total workload requirement associated with each group.
门户的概念将作为最终用户的信息汇总工具。
The concept of a portal is to act as an information aggregator for its end users.
遍历这些员工,计算分区上的员工总数和总工资。
Iterate through them, counting how many there are, and the total salary for the partition.
而支付给美国工人的总工资是海外工人的2倍多。
Yet the total wages paid in the United States amounted to more than twice as much as those paid overseas.
新兴煤矿矿长、副矿长以及总工程师职务已被撤销。
The mine's leader, deputy leader and chief-engineer have all been removed from their posts.
所得的结果就是给定开始日期和结束日期之间的总工作日数。
The end result is the total number of working days between the given start date and end date.
每种元素类型的数量对于估计所需的总工作量将是便利的工具。
The quantities of each element type will be handy tools for estimating the total effort required.
如果此特别的日期是假期,则脚本不会增加总工作日数的计数。
If the particular day or date is a holiday, then the script does not increase the counter for the total working days.
在美国,工资、总工作小时数、工业生产和企业利润均有大幅上升。
In the United States, wages, total hours worked, industrial production and corporate profits have all risen significantly.
欧洲去年银行业的总工资高涨了8%左右,创2007年以来之高。
In Europe the banking sector's total wage bill jumped by about 8% last year, overtaking the previous record set in 2007.
由于该公司还没有购买太多账号(只够其总工作量的10%用),折扣不大。
Because the company hasn't bought many accounts (only enough for 10% of its total workforce), the discount is not big.
但科克指出,该研究调查的是适度上网、或上网时间不到总工时20%的人。
However, Coker said the study looked at people who browsed in moderation, or were on the Internet for less than 20 percent of their total time in the office.
要计算总工作日数,用户可以在显示图1时单击netWorkDays按钮。
To calculate total number of work days, the user clicks the NetWorkDays button as it appears in figure 1.
朱明拟任上海市质量技术监督局总工程师,试用期一年。(2009.7.13)。
Zhu Ming was proposed to be Chief Engineer of Shanghai Bureau of Quality and Technical Supervision. (2009.7.13).
朱明拟任上海市质量技术监督局总工程师,试用期一年。(2009.7.13)。
Zhu Ming was proposed to be Chief Engineer of Shanghai Bureau of Quality and Technical Supervision. (2009.7.13).
应用推荐