• 无人作战飞机寿命至少应该20而且拥有先进航空电子设备电子战能力

    The total life expectancy of the UCAV should be at least 20 years and the drone should have advanced avionics and electronic warfare capabilities.

    youdao

  • 建立了一试验数据估算日历、日历翻修间隔、日历寿命方法公式提出了使用中真实的腐蚀损伤数据来估算日历首翻期的方法 ;

    A set of method and formula for the computation of calendar first D check, calendar time since overhaul and total calendar life is presented by using tests data.

    youdao

  • 日本人寿命很长不是没有原因的,因为他们愿意寿司

    Japanese long life is not without reason, because they are always willing to eat sushi.

    youdao

  • JEAN NACHEGA:“我们研究关键发现非洲接受艾滋病抗逆转录病毒疗法患者预期寿命能够达到接近正常水平。”

    JEAN NACHEGA: "the overall key finding of our study is that the patient in Africa receiving antiretroviral therapy for HIV can expect to live a near-normal lifespan."

    youdao

  • 反应堆发电量全球发电量14%,年龄位数27图表),设计寿命一般40年许多反应堆临近退役

    Nuclear reactors generate only 14% of the world's electricity, and with a median age of about 27 years (see chart) and a typical design life of 40 a lot are nearing retirement.

    youdao

  • 二者寿命之和焊接结构疲劳寿命

    The total fatigue life for welded structure is the sum.

    youdao

  • 通道电阻超过关卡指标时,则认为使用寿命终了。

    End-of-life is generally considered to be the time when the total channel resistance exceeds the specifications for the switch card.

    youdao

  • 本文论述了真空白炽灯压力寿命变化的关系

    The relationship between total pressure and life time in incandescent lamp is described here.

    youdao

  • 因此计数使用寿命不能允许通过计数管的电荷表示

    Thus the counting life of a counter can not be expressed merely in terms of quantity of electric charge passing through it.

    youdao

  • 建立了混凝土非线性疲劳损伤方程变幅荷载疲劳破坏准则分析加载次序效应疲劳寿命影响

    Found non-linear fatigue damage equation and fatigue failure criterion of concrete under variable amplitude load, and analyze the influence of loading sequence on total fatigue life;

    youdao

  • 考虑地震自然灾害影响,桥梁等交通基础设施寿命预期成本包括结构建成本、维修加固的预期费用寿命期内的的灾害失效损失期望。

    Considering the influence of natural disaster, especially earthquake, the life-cycle cost of transportation infrastructure consists of initial cost, maintenance cost, retrofit and loss expectation.

    youdao

  • 本文给出了制定定时寿命试验下指数分布产品失效率抽样检验方案一个方法,检验统计量是试验时间。

    This paper gives a new statistical method of working out a sampling inspection plan for the failure rate of exponential populations.

    youdao

  • 本文给出了制定定时寿命试验下指数分布产品失效率抽样检验方案个新方法,检验统计量是试验时间

    A sampling inspection plan for the failure rate of GBVE distribution with the test statistic of total experimental time based on Type I censoring is presented.

    youdao

  • 试验时间检验统计量,定时截尾寿命试验下研究GBVE分布产品失效率抽样检验方案,随机模拟结果显示此方法有效。

    A sampling inspection plan for the failure rate of GBVE distribution with the test statistic of total experimental time based on Type I censoring is presented.

    youdao

  • 试验时间检验统计量,定时截尾寿命试验下研究GBVE分布产品失效率抽样检验方案,随机模拟结果显示此方法有效。

    A sampling inspection plan for the failure rate of GBVE distribution with the test statistic of total experimental time based on Type I censoring is presented.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定