介绍了峡口水利水电枢纽工程技施设计阶段坝基开挖线、拱坝坝型和拱坝体型优化设计成果。
The optimization design results of the dam base excavation outline and the type and body shape of the arch dam of the Xiakou Hydraulic Project are introduced.
在隧道爆破开挖中,频繁反复的爆破冲击动压力对隧道设计轮廓线、施工误差和围岩的稳定性等有很大影响。
The impulsive dynamical pressure from frequent blasting has a strong influence on designed tunnel contour, construction error and stability of surrounding rock in the course of excavating tunnel.
在隧道爆破开挖中,频繁反复的爆破冲击动压力对隧道设计轮廓线、施工误差和围岩的稳定性等有很大影响。
The impulsive dynamical pressure from frequent blasting has a strong influence on designed tunnel contour, construction error and stability of surrounding rock in the course of excavating tunnel.
应用推荐