• 并且深度进行优化设计取得了显著经济效益

    Optimization for excavation depth of foundation trench is carried out and notable economic benefit is achieved.

    youdao

  • 由于对下卧层残积强烈扰动导致强度丧失,造成自重明显沉降

    The loss of strength due to the strong disturbance of underlaying residual soil by the excavation of foundation trench shall cause obvious settlement of cushion cap with its gravity.

    youdao

  • 土中的机械切槽超前支护种,预筑拱的保护可以安全高效地隧道

    The Mechanical pre-cutting method used in soft ground is a kind of preparative support, it allows tunnel excavation work to be conducted efficiently under the safe pre-lining.

    youdao

  • 施工采用了钢管高压防渗板墙、槽内降水、槽外注水回灌,外加复合土钉墙支护措施保证基坑挖。

    In construction, supporting measures such as steel pipe pile, high-pressure impervious board wall were adopted, ensuring the excavation of base pits.

    youdao

  • 地下连续墙技术早已基础工程中有着广泛的应用,稳定问题一直没有很好地解决

    The slurry trench excavation technique has been widely used in Foundation Engineering for a long time, but the trench stability always is not being resolved well.

    youdao

  • 含水层地区基坑槽,涉及到降水问题

    In the excavation of foundation pit and foundation bench in shallow aquifer area, the problem of dewatering will be involved.

    youdao

  • 在路堑石方施工,采用挤压爆破技术及强行拉槽双向挤压爆破技术控制爆破飞石,爆破块度震动

    This paper discusses the control of flying rocks, lump size and vibration of extruding blasting in cutting excavation.

    youdao

  • 减震降低爆破地震效应手段之一

    The excavation of vibration-isolating slot is one of the possible measures to reduce the influence of blasting vibration.

    youdao

  • 着重淤泥流地区基础处理两个方面进行分析论述引用实例论证该方法可行性

    The methods of pipe excavating and foundation treatment in silt and shifting sand areas were presented, which were proved feasible through a practical example.

    youdao

  • 公路路堑切槽硐室控制爆破中,采用较大不耦合比较进行松动控制爆破。

    Bigger uncoupling is adopted to realize loose controlled blasting in the excavation of chasm notch blasting.

    youdao

  • 实现挖坑边、沿井盖铣刨、液压破碎等功能。

    With it, pit and groove digging, curb and gut milling and hydraulic hammer breaking can all be realized.

    youdao

  • 检测尺寸特别是水平高程斜度是否满足设计要求层是否夯实

    Check the dimensions of dug pipe channel, especially the grade level, inclination against design requirements, check to see whether the bedding is rammed hard enough.

    youdao

  • 介绍F3风化深槽地段施工总体方案,重点阐述风化槽的注浆工艺支护方法

    The total construction plan of F3 weathered deep trough section and related technology methods of grouting, excavation and supporting were also mentioned and analysed in the paper.

    youdao

  • 间槽大规模破坏边坡原始结构应力状态

    The spandrel being excavated on a large scale destroyed the initial frame and stress state of the rock in the slope.

    youdao

  • 这些研究证明对于降低极限压力有效性实际工程应用提供了有价值的参考。

    These studies have proved effectiveness of the ice-breaking trench to reduce the limit ice pressure. It provided valuable information for practical engineering applications.

    youdao

  • 基坑()时,应注意边坡稳定必要时可适当放缓边坡设置支撑

    On pluvial days excavate pit (groove), pay attention to slope stability. If necessary, low slope or set up support.

    youdao

  • 船舶定位抛石成基平台式基床抛石整将基床整平。

    After a foundation trench is excavated, a ship is located by riprapping to form the foundation bed, and the foundation bed is leveled by a platform type foundation bed riprapping leveling ship.

    youdao

  • 并进行了实验室模拟试验得出压槽煤体周围应力分布状态

    The analogue experiment hasbeen made in laboratory. The state of stress distribution around coal body can be obtained when stress relaxationgroove of coal tunnel has been developed.

    youdao

  • 数值分析试验表明卸压和排放瓦斯作用显著,合理两帮竖槽。

    Simulation and cutting test results show that pressure- relief slots efficiently relieves stress and drains out gas and the reasonable shape of pressure-relief slots is two-side slots.

    youdao

  • 数值分析试验表明槽卸压和排放瓦斯作用显著,合理的槽为两帮竖槽。

    Simulation and cutting test results show that pressure - relief slots efficiently relieves stress and drains out gas and the reasonable shape...

    youdao

  • 边坡坡采用过,基槽挖量回填较大工程经济

    Slope with slow slope rate, Foundation trench excavation of earth and backfilling of earth are both relatively larger and the project is not economic;

    youdao

  • 采用三维非线形刚体弹簧元,对小湾坝肩槽边坡进行应力应变及稳定分析,对计算成果进行评价分析,进而评价了工程加固措施。

    Using non-linear 3-D rigid body-spring element method, this paper studied the influence of geo-stress on in-situ shear tests of an undergoing project.

    youdao

  • 采用三维非线形刚体弹簧元,对小湾坝肩槽边坡进行应力应变及稳定分析,对计算成果进行评价分析,进而评价了工程加固措施。

    Using non-linear 3-D rigid body-spring element method, this paper studied the influence of geo-stress on in-situ shear tests of an undergoing project.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定