• 开挖矿用电缆沟不得超过标高个别地方超挖时,其处理方法应取得设计单位同意

    Ultra excavation: cable trench excavation shall not exceed the bottom elevation. If ultra-dig in some places, obtain the consent of design units.

    youdao

  • 坝顶标高最高沉积正常水位三者以上,最高洪水位以下空间

    It refers to space during dam crest level; it is above maximum deposited beach face, storage bottom and normal water level as well as under maximum flood level.

    youdao

  • 坝顶标高最高沉积正常水位三者以上,最高洪水位以下空间

    It refers to space during dam crest level; it is above maximum deposited beach face, storage bottom and normal water level as well as under maximum flood level.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定