近年来华东电网的电力需求有较快的增长,到2007年最大负荷增长有所放缓。
The electric power demand of East China Power Grid keeps increasing in recent years and the growth of its maximum load was a little bit slower in 2007.
即使富裕国家的经济继续以低负荷运转,这些国家到2011年也可以说正在迈向至少四十年里他们最大的集体预算紧缩。
Even though the rich world's economies continue to operate below capacity, in 2011 they are heading for what is likely to be their biggest collective budget squeeze in at least four decades.
设计评审对试运行(最大试运行时间为2年或满负荷情形下4000小时)有效。
The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.
提出了几种年最大降温负荷测算方法,并利用实例进行了验证,结果表明所提出的测算方法是可行的。
Several methods are proposed to calculate the yearly maximum cooling load. They are verified by examples and the results show that the methods are feasible.
C设计评审对试运行(最大试运行时间为2年或满负荷情形下4000小时)有效。
The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.
C设计评审对试运行(最大试运行时间为2年或满负荷情形下4000小时)有效。
The C-Design Assessment is valid for test operation comprising a maximum of 2 years or 4000 equivalent hours at full load.
应用推荐