第三十八条筹建处工作人员的编制、报酬及费用,经甲乙双方同意后,列人工程预算。
The authorized size, payment and expense of the preparation office, upon the agreement of both Party a and Party b, shall be listed in the project budget.
通过工程预算得到不同工艺不同规模的处理方案的总费用,通过曲线拟和得到不同工艺的费用和规模的函数关系式。
This essay shows the whole expense of the different treatment schemes through the project budge, and USES curves to obtain the mathematical models of different technical charges and scales.
筹建处工作人员的编制、报酬及费用,经甲乙双方同意后,列入工程预算。
After approved upon by both parties, the establishment, remuneration and the expenses of the staff of the preparation and construction office shall be covered in the project budget.
经甲乙双方同意后,工程预算应包括筹建工厂人员的编制、报酬及费用。
The establishment, remuneration and the expenses of the staff of the preparation and construction office, when agreed by both parties, shall be covered in the project budget.
在四川盆地的地震勘探工程中,地震资料野外采集施工费用,即地震工程预算中的直接工程费,占整个地震勘探工程成本的80%左右。
The expense for the field acquisition of seismic data, i. e. the direct cost in the budget of the seismic engineering, accounts for about 80% of the whole engineering cost of seismic exploration.
便于工程预算较法兰式连接节约总工程费用地20%,施工无需电源、氧气、明火。
It's easy for project budget and can save 20% of the total charge compared to flange connecting, the construction don't need the power supply, oxygen, and fire.
便于工程预算较法兰式连接节约总工程费用地20%,施工无需电源、氧气、明火。
It's easy for project budget and can save 20% of the total charge compared to flange connecting, the construction don't need the power supply, oxygen, and fire.
应用推荐