工程量清单计价计算清单算的所有项目。
Quantity Pricing calculated counting all the items in the list.
实施工程量清单计价后,造价管理有很多工作要做。
After the execution of the listing valuate of the amount of works, there are still many work to do.
在工程量清单计价中,清单项目组价是其重点和难点。
Item pricing is an important but difficult task in priced bill of quantities.
为了实现与国际接轨就必须推广采用工程量清单计价模式。
It is necessary to widespread and adopting valuate mode of engineering list in consonance with international engineering.
制定与工程量清单计价体系相适应的建设工程施工合同条件。
Enacting the construction contract condition of the construction engineering, which is suitable for the valuation system of the list of engineering amount.
工程量清单计价模式下的投标报价,是一个有机构成的体系。
Biding under the mode of valuation with bill quantity is an organic system.
《清单计价规范》是对工程量清单计价的整个活动进行规范。
The "Specification for list of price calculation" is to normalize the whole process of the list of price calculation on engineering work amount.
《建设工程工程量清单计价规范》已作为国家标准规范发布实施。
The "specifications of Charging on Bill of Quantities of Construction Projects" have been published and implemented as national standard specifications.
随着工程量清单计价模式的推广,按国际惯例招标投标势在必行。
With the bill pricing model projects to promote, in accordance with international bidding practices is imperative.
阐述了工程量清单计价与招标投标的关系以及应用时就注意的问题。
The relation between the quantities calculation and bidding, and some problems in application are discussed in this paper.
工程量清单计价方法是国际上较为通用的一种先进的造价管理方法。
The valuation mode of BOQ is an International common and advanced method in pricing management.
简述了工程量清单计价方法的优势,以及在输变电工程中应用的对策。
This paper briefly introduces the advantages of the bill of quantities pricing method and the application in power transmission engineering.
以下就在市场竞争的环境下工程量清单计价模式的风险承担展开探讨。
The Risk Taking in engineering bill pricing mode is discussed in the competition market environment.
相对于传统的定额计价方法,工程量清单计价方法是一种新的计价模式。
The measurement valuation of project quantities bill of building works is a new method of valuation relatively to the traditional method of norm valuation.
工程量清单计价中综合单价的确定,是安装工程项目投标报价的核心内容。
The key objective of bidding in installation project is to determine the comprehensive unit price in the Bill of Quantities pricing.
并且结合工程量清单计价模式下合理低价中标的原则进行了投标决策分析。
With principle of reasonable low price for bidding, analysis of bidding decision is made combined mode of BOQ.
提出,工程量清单计价模式下的工作重心相比定额计价模式有了很大的转变。
The traditional pricing model focuses on measuring according to the pictures and applying the corresponding quota.
本文对工程量清单计价进行了简要分析,并着重探讨了该模式下工程造价的控制。
In this paper a brief analysis of the bill of quantities, and focused on the project cost control in this mode.
推行工程量清单计价,工程造价管理必须实现从静态管理到动态管理的一系列转变。
To implement the BOQ type measurement and payment, a series of transitions from static management to dynamic management should be realized in project cost management.
文章通过对工程量清单计价的解读,提出了如何做好清单计价这一新方法的几点建议。
Through the interpretation to priced bill of quantities, the article makes Suggestions on how to put priced bill of quantities into smooth operation.
结合工程量清单计价模式的特点,从承包商的角度对综合单价风险分析方法进行了阐述。
Based on the characteristics of BOQ (bill of quantities) valuation model, this paper elaborates on the risk analysis method for integrated unit price from the perspective of contractors.
本文阐述了工程量清单计价的特点和重要性以及工程量清单计价与传统定额计价的区别。
It also point out the difference of counting on engineering quantity and the traditional counting on norm.
文章作者详细分析工程量清单计价的意义、概念、作用及基本特征,并提出应注意的问题。
The author analyzes the meaning, concept, function and characteristics of engineering list cost and puts forward relevant problems.
介绍了工程量清单计价软件的开发方案和软件的功能模块,指出了软件开发中应注意的问题。
This paper introduces the developing schemes and functional modules of the quantities-bill-based pricing software, and points out some problems needing attention in the development of this software.
我国已加入WTO,我国的工程造价管理将不得不遵循的国际惯例采用工程量清单计价模式。
With China having been the member of WTO, the engineering cost management in our country will adopts the bill of quantities mode which is widely used in international bidding.
《建设工程工程量清单计价规范》的实施,对施工企业在投标时进行成本预测提出了新的要求。
The implementation of the Specifications of Charging by Bill of quantities has set new requirements for cost forecast by construction enterprises in bidding activities.
随着我国加入世界贸易组织,建设工程计价与国际接轨,全面实行工程量清单计价已是大势所趋。
With the entry to the WTO, valuation of construction engineering in China is converging to-ward the international mainstream, adopting valuation based on engineering quantity list.
在工程量清单计价模式下工程造价由分部分项工程费、措施项目费、其他项目费、规费和税金等构成。
When pricing based on bill of quantities, the project cost consists of sub-engineering fee, measure fee, other fee, regulate fee and tax.
在建设工程招投标中实行工程量清单计价和工程实物量清单计价是规范建设市场秩序的治本措施之一。
Also it is one of measures to affect a permanent cure in regulating the order of construction market.
在建设工程招投标中实行工程量清单计价和工程实物量清单计价是规范建设市场秩序的治本措施之一。
Also it is one of measures to affect a permanent cure in regulating the order of construction market.
应用推荐