审核和跟进工程更改;
控制工程更改物料库存,避免过剩物料和新旧物料有序导入。
Control ECN for EOL materials or other excess stocks and phase-in materials.
EWO流程是上汽通用五菱汽车股份有限公司的工程更改签署电子流程。
EWO process is one of signing process for engineering changing in SGMW Automotive Co.
参与产品部门提出的工程更改项目的技术讨论,负责模具改造的供应商选择及实施。
Participate in technical discussion on ECN, select die supplier for die changes and track the change.
深入分析了汽车零部件产品工程更改风险因素,建立了工程更改风险因素分析模型。
By analyzing the risk factors in the engineering change process of the automotive components, this paper establishes the analysis models of the risk factors in the engineering change processes.
作为长安福特和产品工程源头的联络窗口,在 工程更改控制和WERS问题处理 过程中确保 工程更改的顺利导入和进行。
Act as the interface between ChangAnFord(CAF) and the Engineering Source(s) on ECC and WERS concern process, to ensure smooth progression and introduction of changes.
在分析虚拟企业更改控制特点的基础上,研究了跨企业间更改建议的发起与协商机制,给出了虚拟企业进行工程更改应遵循的原则,提出了虚拟企业进行工程更改的集成框架模型。
The mechanism of initiation and negotiation of change proposal among the ve was investigated, the principle for ECC in the ve was provided, and an integrated framework model for ECC was proposed.
一旦更改了编译器遵从设置,您将需要重新构建工程,如下面图8中所示。
Once you change the compiler compliance Settings, you will have to rebuild your project, as seen below in Figure 8.
更改控制管理可以提供灵活性,同时有助于实现严谨的工程原则。
Change control management allows for flexibility, and at the same time, promotes disciplined engineering principles.
有限制的暂停时间的减少源于收集方法的增加和细致的工程决断,包括对VM的基本更改。
The reduced bounded pause times result from an incremental approach to collection and careful engineering decisions that include fundamental changes to the VM.
传统需求工程不允许您在实现需求之后整合新的更改。
Traditional requirements engineering doesn't let you incorporate new changes after you implement the requirements.
这次修正是英国国家统计局有史以来最大的一次;它说修正的原因是其对工程及服务业估计的有更改。
The revision is one of the biggest ever made by the ons and it said the reasons were changes to its estimate of the construction and services sectors.
如果你尚未尝试它的话,你会发现当你更改很多CSS的话,重新装载每个页面将是一个巨大的工程。
If you hadn't tried it, it may not seem like a big deal to reload a page on every CSS change... until you've made a few hundred of them.
应用程序中的更改,包括现有应用程序的再工程和要创建的应用程序中的设计更改。
Changes in applications, including reengineering of existing applications and design changes in applications to be created.
更正:本文最初说乔布斯在一个周末打电话给一名苹果的工程师,要更改图标的颜色,那名工程师实际上是谷歌的工程师。
Correction: the engineer Steve Jobs called one weekend to correct the colour of a logo worked at Google, not Apple, as originally stated in this article.
因此,弹性工程师可能需要增加现有系统的容量,并相应更改其操作过程。
As such, the Resilience Engineer may need to increase the capacity of the existing systems and alter their operational procedures accordingly.
在这个屏幕快照中,有一个针对分模线的附件(工程师将在这个附件就绪时填充它)和一个针对这个更改请求的项目计划的附件。
In the screenshot there is an attachment for the die line (the engineer will populate this attachment when it is ready) and an attachment for the project plan for this change request.
他们被提交给承包商和工程师,所有这些人都会请求更改,所有这些更改(如果可见,或至少影响成本或进度)都要由客户同意。
They're submitted to contractors and engineers, all of whom request changes, all of which (if they're visible, at least, or affect cost or schedule) are run by the client.
“合同”指工程履约方之间签署的书面协议及其所有附件,包括各方共同同意的更改及补充文件。
"Contract" shall mean the written agreement between the parties concerning performance of the Works, and all appendices, including agreed amendments and additions to the said documents.
电气设计和估计的电气工程项目更改令的总体指导下的项目工程师。
Electrical design and estimating of electrical works of project variation order under the general direction of project engineer.
铁路车站道岔的选择和咽喉区布置不仅对运营效果影响很大,而且与桥隧工程一样不更改。
The selection of switch and throat arrangement has great impact on the operation efficiency and is unchangeable like bridge and tunnel engineering.
每一个工程技术更改必须由技术部以正式的文件及时通知质量,生产,材料部门。
Engineering Dept. must inform each engineering change with formal documents to Quality Dept. Production Dept. and Material Dept. timely.
但是,工程上的更改必须要经过设计人员批准,以保证不会损伤产品的功能。
But, in the project change must have to pass through designs the personnel to authorize, guaranteed cannot damage the product the function.
如果我知道我的项目工程使用一个特定的数据库而且不会更改的话,我提倡使用存储过程。
Personally, I would like to go in for stored procedures and leverage most of the database capabilities if I knew my project was going to use a specific database and wouldn't change.
供水管网是一项不断变迁、更改的工程,没有最终的模式。
Water supply network is an ever-changing, changing the project, there is no final model.
依照第25款的规定,买方有权在工程交付使用前要求对工程的工作范围、设计和建造进行更改。
Subject to the provisions of Clause 25, the Purchaser is entitled to require variations to the scope, design and construction of the Works until the Works have been taken over.
承包商不应对永久工程作任何更改或修改,除非且直到工程师发出指示或同意变更。
The Contractor shall not make any alteration and/or modification of the Permanent Works, unless and until the Engineer instructs or approves a Variation.
承包商不应对永久工程作任何更改或修改,除非且直到工程师发出指示或同意变更。
The Contractor shall not make any alteration and/or modification of the Permanent Works, unless and until the Engineer instructs or approves a Variation.