• 考虑并行加工机上不同尺寸工件调度问题目标极小最大完工时间

    The problem of scheduling jobs with non-identical sizes on parallel batching machines is considered; the objective is to minimize the maximum completion time (makespan).

    youdao

  • 车床能够旋转工件最大尺寸

    This is maximum diameter of work that can be rotated on a lathe.

    youdao

  • 车床能够旋转工件最大尺寸

    This is maximum diameter of work that can be rotated on a lathe.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定