整体浇铸的尾柱采用传统的在总装线船台上待分段合拢后,再拉主机轴线定位安装的方法施工难度大、船台周期长。
Traditionally, the integral casted stern post is positioned according to engine′s axes after completing subassembly on the berth. This technology is executed difficultly and needs large berth period.
在窑尾结构设计中选用不同的框架柱截面形式和支撑形式对窑尾结构整体的工作性能以及工程造价都有很大的影响。
Choosing among different column cross-section forms and supporting forms in structural designing of kiln tail would have a great effect on the integral working performances and construction costs.
与卫生部药品标准方法相比,柱效提高、拖尾现象减小,杂质分离更加有效。
Compared with the current method, this method was better in the column efficiency, less tailing and effective separation of impurities.
本文以滑移机理研究“柱出口效应”失效的机制,以探讨伸舌色谱峰和拖尾色谱峰的形成机理。
The invalidation of the effect of column outlet was researched with slip mechanism, for the investigation on the cause of forming tailing peak and leading peak.
全器保存完好,长流,尖尾,筒身,卵底,双柱,三足。
The whole bronze Jue is well preserved, including its long-stream, pointed tail, shell, luandi, two columns and three legs.
八尾人柱力旋转,并且跳跃往前旋转假如你时间合适,你可以往回跳跃。
Killerbee spins, and jumps forward while spinning. If you time it right, you can bounce back.
第一个于八尾人柱力的众多七刀流攻击!
第一个于八尾人柱力的众多七刀流攻击!
应用推荐