• 湿法刻蚀导坑,需适当延长刻蚀时间。

    Etching time has been extended in wet etching course.

    youdao

  • 随中导坑扩大而减小,其中中导坑宽度影响较大

    The axial force of middle wall decreases with the increase of the middle heading, the width of middle heading influences greater.

    youdao

  • 介绍秦岭特长隧道工程平行导坑设计标准、施工技术要点

    Design code and key technical points for main tunnel and parallel heading of East Qinling Super-long Tunnel are introduced.

    youdao

  • 总体上分析结果可知,双侧壁导坑适合双向车道连拱隧道施工。

    It can be concluded that from overall analysis the double-side-drift method is more suitable than the CRD method in multiple-arch tunnel with eight traffic lanes.

    youdao

  • 本文介绍北京地铁西单车站号施工横通道,正洞导坑交接处开口段结构模型试验情况。

    This paper deals with a structure model test under static load to study the stress characteristics of the structure.

    youdao

  • 本文介绍北京地铁西单车站号施工横通道,正洞导坑交接处开口段结构模型试验情况。

    This paper deals with a structure model test under static load to study the stress characteristics of the structure.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定