• 目前许多电站负荷分配需要使用机组效率曲线,但是由于机组效率曲线通过模型机得来,实际运行中难免会误差

    At present, in order to dispatch load, lots of hydropower stations need to use the unit efficiency curve, which more or less has some errors because it is obtained by model test.

    youdao

  • 采用ZIP负荷模型计算系统PV曲线并与采用功率负荷模型时的结果进行了比较,得出了一些实际意义结论

    ZIP load model is used to calculate the PV curves of the power system, and some meaningful conclusions are drawn by comparing its result with which constant power load model is used.

    youdao

  • 通过华东某地电网负荷96曲线预测结果显示方法效果较,日预测均方根误差在1.78%以内,较好地满足实际电力系统负荷预测要求

    The forecasting results of a city in east China showed that, the MSE forecasting error of 96 points daily load is only about 1.78%. The method can satisfy the request of real power system well.

    youdao

  • 为了满足负荷生产需要,根据实际操作条件调整原设计曲线

    The baking process of the baking furnace for making anodes is modified in order to meet the demands for operation conditions, that is the fuel and draft level.

    youdao

  • 为了满足负荷生产需要,根据实际操作条件调整原设计曲线

    The baking process of the baking furnace for making anodes is modified in order to meet the demands for operation conditions, that is the fuel and draft level.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定