有些井刚钻完并进行完井作业后,就立即采取钻杆测试。
Drill stem tests are taken from some Wells almost immediately after drilling and completion operations.
最近,新型压裂球应用触角延伸至桥塞和射孔完井作业中。
More recently, dissolving balls have been deployed with bridge plugs for plug and perf completions.
大多数的样品来源于完井作业以及生产过程中的油、水混合物。
More samples are taken during completion operations and then from produced oil and water during production.
该公司将在完井作业过程中测试新区域以确定其潜在开发价值。
Manitok will test the newly discovered zone during the completion operation in order to determine its potential for future development.
在石油射孔完井作业中,射孔弹架起着携带和准确定位射孔弹的作用。
In well shooting operation, shooting frame functions to shoot firmly and accurately.
迄今为止,高强度可分解压裂球主要应用于油田的滑动套筒完井作业中。
To date, the main oilfield application for high strength dissolvable materials has been for dissolvable frac balls used with sliding sleeve completions.
卡瓦打捞筒作为钻修井打捞工具,主要用于钻完井作业打捞落物的外捞工具。
Slip socket, the fisher of drilling and repairing well, is mostly used as the outer fisher to fish the drop during the drilling and completion.
为了保证分支井钻井和完井作业的顺利进行,必须在施工过程中确保井眼的稳定。
For the successful operations of drilling and completion of the branch wells. it is necessary to maintain borehole stability in construction process.
在海洋探井钻井过程中,隔水导管的强度及稳定性对于安全钻完井作业具有重要意义。
In the operation progress of offshore exploratory well, the strength and stability of drilling riser can play an important role in offshore drilling and completion.
改造后的钻井帽先后用于旅大油田群2座平台的钻、完井作业,有效地降低了开发成本。
The modified drilling cap was used in the drilling and completion on 2 platforms in the cluster of LD oil fields, as a result that the development cost has been reduce effectively.
对于低渗微裂缝储层钻井完井作业而言,固相侵入、应力敏感、水相圈闭是主要损害机理。
For low permeability micro - fractured reservoirs drilling and completion operations, the solid phase invasive, stress-sensitive, water trapping is the main damage mechanism.
无控制的钻井、固井、完井作业,或者压力控制不当都会造成两种极端危险的情况,即井喷或井漏。
No control of drilling, well, the well completion work, or improper pressure control can cause two extremely dangerous situation, that is, the well blowout or leakage.
随着我国侧钻井和小井眼钻井需求的不断增加,连续油管作业技术在我国水平井钻井、修井及完井作业中将会发挥巨大作用。
With the increasing demand of the lateral drilling and slim hole drilling, the coiled tubing (CT) operating technique will play a great role in horizontal well drilling, well workover and completion.
针对倒扣式常规安全接头在井下退开难度较大,剪钉式安全接头完井作业易中途断脱的问题,研制了一种液压控制型安全接头。
To solve problems of difficultly releasing and easily breaking off of the conventional safety joint while operating in downhole, a new hydraulic controlling joint is developed.
完井时我们要向作业者提供一份详细的泥浆工程作业完成报告。
At the end of the well we must provide operator with a detailed review of the mud engineering operations performed.
没有进行增产处理作业(如压裂或酸化)的完井。
A well completion with no stimulation such as fracing or acidizing.
作业完井的一个辅助工具,循环阀用于在压井或启动时循环流体。
As a completion accessory, a circulation valve is included to circulate fluid for well kill or kickoff.
一口油井在经过钻井、测井和完井等复杂的作业后,接下来面临的难题就是实现高质量的、稳定的采油作业。
After drilling, logging and completion operation, a well immediately faces the problem how to achieve high and steady yields.
膨胀管技术可应用于钻井、完井及修井等作业过程,被认为是当前石油钻井行业的核心技术之一。
Expandable tubular technology can be applied to drilling, well-completion and restoration, and is considered to be one of the core technologies in the current oil drilling industry.
由于有机盐无固相水溶液密度可调范围大、溶液粘度低、抑制性强等特点,得以作为油气井工作液的基液在钻井、完井、试油等作业中推广应用。
The solid-free organic salt solution is applied to based-phase for work fluids because of their adjustable density, low viscosity, and strong inhibition and so on.
试验井三叠系、石炭系平均井径扩大率小于6%,完井电测及下套管固井等作业顺利。
Hole enlargement through the Tertiary system and the Carboniferous system in test Wells are less than 6%, therefore, got a successful completion logging and running casing strings.
一家中东地区的作业者,希望通过优化射孔来提高垂直井普通完井的油藏产量。
A Middle East operator had a vertical natural completion and wanted to improve contribution percentage from each perforation tunnel.
本文的结果对水平井钻井、完井和增产改造等井下作业管柱的正确设计和作业参数的合理选择等具有重要的参考价值。
The results obtained here are very important for correctly designing pipes and reasonably selecting working parameters in horizontal well drilling, completing and stimulating operations.
在钻井、完井等井下作业过程中,造成油气层渗透率下降的现象通称为油气层损害。
The phenomenon of reservoir permeability decrease caused by drilling, completion and other underground operation is known as formation damage.
此外,工作中和完井后的井筒监测和分析还可用于判断增产作业的效果。
Monitoring and analysis can be performed during and after the job to confirm treatment effectiveness.
此外,工作中和完井后的井筒监测和分析还可用于判断增产作业的效果。
Monitoring and analysis can be performed during and after the job to confirm treatment effectiveness.
应用推荐