开发和评审设计失效模式及后果分析。
Developing and auditing Design Failure Mode and Effect Analysis (DFMEA).
如有需要,是否都进行了包括失效模式及后果分析在内的过程能力分析?
Are process capability studies including Failure Mode Effects Analysis (FMEA's) conducted where applicable?
结合电梯用钢丝绳绳芯直径过程控制,建立电梯用钢丝绳绳芯直径潜在失效模式及后果分析表。
Combining with the course control of rope core diameters of steel wire ropes for elevators, the FMEA table is established.
结合电梯用钢丝绳绳芯直径过程控制,建立电梯用钢丝绳绳芯直径潜在失效模式及后果分析表。
Combining with the course control of rope core diameters of steel wire ropes for elevators, the FMEA table is established.
应用推荐