• 所有的吹器都配有密封空气系统圆盘。该处空气来自密封空气风机系统。

    All sootblowers shall be provided with a positive pressure, sealing air system to wall boxes and poppet valves. This air shall be obtained from the seal air fan system.

    youdao

  • 单个过滤除尘器磨擦破损的。

    A single filter bag dust collector and tank wall friction damage.

    youdao

  • 文中BASIC语言编制程序适用梯形局部区域较多热量输入情况。

    The program compiled with BASIC language is also applicable to trapezoid wall or that without hole, but with more heat transfer into local portion of the wall.

    youdao

  • 结合安庆长江公路大桥施工,介绍大型围堰设计方法关键施工技术

    Taking Anqing Highway Bridge over Yangtze River for example, give the design and key construction technology in large double-wall steel cofferdam.

    youdao

  • 通过混凝土刚度分析推导出了构件拉力分配公式。

    Through analysis the tensile stiffness on concrete pylon wall and steel anchorage box, the formula about tension distributing of various component are induced.

    youdao

  • 系统完成典型制冷装置换热器部件,如板管式蒸发器脊翅片管式蒸发器、冷凝器参数化设计绘图

    The system implements the parametric design and drawings of many typical kinds of refrigerating parts, e. x. the plate-tube evaporator, the single back-fin evaporator and the box condenser.

    youdao

  • 然后模拟了二矩形做简谐横摇运动引起液体受迫晃荡计算结果不同高度处压强时间历经给出,并与实验结果进行了定量比较

    Then, the forced sloshing in a two-dimensional rectangle box is simulated, and the time course of pressure at different height of the wall was gotten and compared with that of experimental result.

    youdao

  • 证明水玻璃白云石砂溃散性与铸件大小浇注温度、吃时间有关。

    The collapsibility of the sodium silicate dolomite sand is controlled by the size, wall, pouring temperature, capacity for sand and draw time of the cast.

    youdao

  • 研究了变压器绕组预紧力变压器振动之间关系。

    The relation between transformer windings under different axial precompression and the vibration of transformer walls is studied.

    youdao

  • 文章DBC制造300MW“W”形火焰锅炉例,详细地介绍了锅水冷燃烧器水冷典型结构制造方法

    The paper gives a detailed introduction to the typical structure and manufacturing method of drum, waterwall, burner and waterwall header of the 300mw double arch furnace boiler produced by DBC.

    youdao

  • 本文应用有限元法编制了计算程序微型机上对机床主轴进行平面稳定温度变形的理论计算。

    In this paper, calculation programs of planar stationary temperature field and heat deformation for spindle box of general lathe are developed.

    youdao

  • 锅炉右下集产生了很多环状裂纹三个渗水同时顶棚水冷塌陷

    A multitude of ring-shaped cracks and three water leakage points were discovered in the right side lower header of a boiler together with a cave-in of the boiler roof water-cooled wall.

    youdao

  • 锅炉系统左右水冷组成,主要受热面炉膛水冷,部分锅筒锅筒内对流管束

    The boiler heat exchange system is composed of a boiler barrel, a left and right set box, and a water cooling wall, which is composed of a boiler water cooling wall, a tube and a tube bundle.

    youdao

  • 第一具有相对两个相对的

    The first box is provided with a top wall, two opposite sidewalls and two opposite end walls.

    youdao

  • 介绍神马尼龙66公司空分装置一起由压机油泵晃电而导致的系统停车紧急启动液氮汽化系统过程中由于液氮取出阀内漏所造成冻裂事故

    The paper describes a sudden shutdown of the air separation plant operating in Nylon 66 Salt Corporation due to instantaneous power failure of the compressor oil pump.

    youdao

  • 两个左侧隧道包含雷达红外传感器照相机独家右面墙上包含一个额外的雷达传感器。

    The two boxes affixed to the left side of the tunnel wall contain the radar, infrared sensor and camera while the sole box on the right wall contains an additional radar sensor.

    youdao

  • 传感线控制电路主板设置夹层

    The sensing wire and the control circuit board are arranged inside the interlayer of the suitcase wall.

    youdao

  • 本实用新型要点消毒分体

    The key point of the utility model is that the sterilization cabinet and the tank wall are separated one another.

    youdao

  • 所用液体与半球形之间的接触加载形成了失重初始液面。

    The liquid used has zero-degree-static-contact angles on the semispherical container and is exposed to an initially concave interface in a zero-g environment before thrust.

    youdao

  • 框架框架专门为顶部两侧货物而设计管道机器。有或无、可折叠或不可折叠框架

    Framework for me the framework for me to be from the top or both sides of the packing of goods designed for the serious, such as pipes and machinery.

    youdao

  • 发生事故主要原因之一过热器、再热器进口集引入三通处蒸汽复杂流动工况下产生涡流,处在涡流区的管屏蒸汽流量减少,使汽温和金属温升高。

    The main source of these failures are vortices existing, in front of Tee-Junctions of entering headers of superheaters and reheaters, caused by the complex flow conditions in the headers.

    youdao

  • 最后两个因素那么重要记住乘坐更严厉航空形截面模型称为一些未知原因轮辋今天)。

    While the last 2 factors are not that important keep in mind that aero rims ride harsher than box-section models (today called "double-wall" rims for some unknown reason).

    youdao

  • 通过对景洪澜沧江大桥索塔顶端模型加载测试,验证了预应力设计的可靠性。

    By test-loading of model of the tower-top hollow section model for Lan-cang River long-span bridge in Jing-hong, adequacy of prestressed loop stirrup design is testified .

    youdao

  • 通过对景洪澜沧江大桥索塔顶端模型加载测试,验证了预应力设计的可靠性。

    By test-loading of model of the tower-top hollow section model for Lan-cang River long-span bridge in Jing-hong, adequacy of prestressed loop stirrup design is testified .

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定