《规划》中涉及的建设项目,按照基本建设程序审批。
The construction projects involved in the Planning shall be examined and approved pursuant to the procedures for infrastructures.
第二十二条公路建设应当按照国家规定的基本建设程序和有关规定进行。
Article 22 Highways shall be built in accordance with the procedure for capital construction prescribed by the State and the relevant regulations.
本次设计依据相关经济和工业政策,坚持基本建设程序,符合国家标准。
The design based on relevant economic and industrial policy, and adhere to the capital program, in line with national standards.
轨道交通建设计划按照国家和本市规定的基本建设程序批准后组织实施。
The CRC construction plan shall be organized and carried out after approval according to the procedure of capital construction set by the State and this Municipality.
可行性研究是建设前期工作的重要内容,是基本建设程序中的重要组成部分。
The feasibility study is the important content in the period of the earlier constructing time, and is the constituent of the capital construction procedure.
内容摘要:各项工程建设在设计和施工前,必须按基本建设程序进行岩土工程勘察。
Contents summary: Each item engineering construction at design and construction before, have to carry on rock soil engineering to investigate according to the capital construction procedure.
风景园林可行性研究是风景园林基本建设程序中的重要组成部分,现缺乏全面和深入的专项性研究。
Feasibility study is a component of the basic construction process for landscape architecture. However, insightful and overall studies are still lacking.
合理确定有效控制造价,必须按基本建设程序办事,以设计为重点进行全过程的造价控制和科学管理。
In must be follow basis construction program if want to logical confirm effective control cost, base on design as key point take full process cost control and science management.
介绍了水文水资源工程建设程序,阐述了水文基本建设前期各项工作的具体要求,探讨了需要注意的问题。
This paper expounds the present situation and existing problems of water conservancy construction in Hengyang old liberated area, analyses the lag reasons and proposes appropriate countermeasures.
介绍了水文水资源工程建设程序,阐述了水文基本建设前期各项工作的具体要求,探讨了需要注意的问题。
This paper expounds the present situation and existing problems of water conservancy construction in Hengyang old liberated area, analyses the lag reasons and proposes appropriate countermeasures.
应用推荐