• 严禁堆放木材其它杂物。

    The Second method is strictly forbidding stack woods and other goods on the dam.

    youdao

  • 溢流碾压混凝土台阶式溢流

    The spillway face are RCC benched spillway face.

    youdao

  • 橡胶板作为防护具有优越性。

    Rubber panel as a new type of Facing is proposed for overflow embankment dam.

    youdao

  • 坡度改变对消冲有一定的影响

    The changing in dam gradient affects the energy dissipation and erosion prevention.

    youdao

  • 本文介绍了边界条件温度荷载计算情况。

    In this paper, the temperature field boundary conditions and the temperature loads calculation for this arch dam are described.

    youdao

  • 计算表明压力分布自由位置与实验资料吻合良好

    Numerical results of pressure and profile of the free surface are good agreement with the experimental results.

    youdao

  • 论述过水度汛一般程序,并结合工程实例加以说明。

    Discussed the general procedure of flood prevention with overflow dam with the project example.

    youdao

  • 论述坝面沉降分布规律体固结过程沉降变化趋势等问题。

    The surface settlement distributive law and the consolidating procedure and the surface settlement variable tendency of the dam are also expounded.

    youdao

  • 铺上防渗PVC土工衬垫与PVC膜片焊接固定在一起。

    The impervious PVC geomembrane liner is deployed over the dam face and anchored by welding to the PVC flaps.

    youdao

  • 本文介绍新安江电站溢流坝面环氧砂浆抗冲磨涂层老化状况研究

    This paper introduce the research on aging effects of the Xinanjiang hydropower station.

    youdao

  • 根据实测数据计算结果,对隔墙脉动压力特性进行分析研究

    In accordance with the measured data and the calculated result, the characteristics of the fluctuating pressures on the dam surface partitions are analyzed.

    youdao

  • 因此一般采用上游铺设复合土工垂直防渗措施进行防渗漏处理。

    A combined measure of paving compound film on the upstream surface of dam and setting up vertical anti-seepage in dam foundation is adopted to treat leakage.

    youdao

  • 方法能够准确计算太阳辐射均匀分布,为温度计算提供准确的边界条件

    The distribution of solar radiation on dam surface can be computed by the method and accurate thermal boundary conditions of the dam temperature field are obtained.

    youdao

  • 并对保温方案进行分析,最后采用硬质发泡沫聚氨酯保温方案对大坝面进行保温。

    The scheme of spraying the hard foaming polyurethane is chosen to heat insulated of the dam.

    youdao

  • 同时,该式亦可用于对台阶溢流最大流速进行估计,以便判别坝面出现空蚀破坏可能性

    The calculations are also useful to estimate the maximum velocity of overflow surface that can be use to judge the possibilities of cavitation damage at the stepped overflow surface.

    youdao

  • 利用级数展开线性叠加原理本文给出了一种求取弹性动水压力影响系数矩阵数值算法。

    A method is set forth to calculate the hydrodynamic pressure influence matrix of elastic dam using series development and linear superposition theorem in this paper.

    youdao

  • 混凝土受到强震,容易高处形成裂缝在那里下游横贯垂直的“烟筒部分

    Concrete buttress DAMS when subjected to severe shaking have developed horizontal cracks at the elevation high in the DAMS where the downstream buttresses intersect the vertical "chimney" section.

    youdao

  • 研究复杂地基上高拱开裂稳定的力学机制这些机制涉及到大温度变化、大基础弱化渗流影响等。

    The stability of arch DAMS and their cracking mechanism have been discussed. They are concerned with thermal variation, rigidity weakening due to earthquake and seepage effects.

    youdao

  • 针对除险加固措施,确定水库特征水位库容,计算超高顶高程,探讨了防渗护坡及防冻等问题。

    Characteristic water level and reservoir capacity is fixed, freeboard and dam crest is calculated, seepage prevention of dam body, dam foundation and dam sheeting is discussed.

    youdao

  • 基于此,本文应用嵌入式滑移模型钢筋刚化模型模拟混凝土重力配筋前后地震动力响应,据此评价坝面配筋措施的抗震效果。

    The dynamic response of a concrete dam before and after strengthening has been simulated by the embedded slip model and the reinforcement stiffening model respectively.

    youdao

  • 由于圆锥滚子轴承笼子通常伸出轴承必须采取特别照顾按照推荐尺寸

    Because the cages of taper roller bearings usually protrude beyond the bearing faces, special care must be taken to follow the recommended abutment dimensions.

    youdao

  • 一方,针对我国有关矿山截污人们虚荣越来越多商家开始倾斜更多强调外观质量适应消费者需求

    For another, inview of people's vanity, more and more merchants are inclining to put moreemphasis on the appearance than quality to adapt to consumers' demand.

    youdao

  • 下游护至排水体,排水棱体时则护至

    For those downstream, they protect the space from dam crest to draining prism or to dam heel in event of no prism.

    youdao

  • 金安桥水电站卸荷结构构造结构发育,左边坡稳定问题对整个安全重要作用。

    For the development of the unburden structure face and constitution structure facing, it is important that left dam shoulders side slope stability to the dam safety.

    youdao

  • 工程推荐碾压混凝土重力方案通过地质勘察资料细致分析、评价,从而合理选择建基

    This project recommend concrete gravity dam plan, by means of analysis geology data, we could select dam foundation plane reasonablely.

    youdao

  • 通过计算分析得出,上游坡边线附近区域最易液化其次在初期附近。

    The calculation results show that the primarily liquefied area is near water line and the secondary is starter dike.

    youdao

  • 上游内部偏上游处设置了混凝土防渗砌石为成层异弹模

    Seepage proof facing plate or watertight concrete layer often locates in stone masonry arch dam.

    youdao

  • 针对问题,提出局部等效应力方法,即对趾局部区域进行局部等效处理,中间大部分区域仍采用有限元计算

    In this paper, the assumption of equivalent stress method only used near the dam heel and toe and the middle regions stress USES the FEM calculated stress.

    youdao

  • 数学模型坡坡设计提供了一种准确、方便、适用数字化设计的数学模型。

    The mathematical model provides a correct, convenient mathematical model which can be applied to digital design for the design of the side slope of roads, Banks, canals and DAMS.

    youdao

  • 提高洲水电站二RC C的抗性,体上游采用防渗护技术。

    The impervious facing is built on the front side of Gaobazhou RCC dam to improve its impermeability.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定