• 应用高位综放工艺回采煤柱资源对于已有38开采历史来说一种经济高效手段

    The application of elevated fully mechanized caving mining technology is an economical and efficient means for an old coal mine with an exploitation history of 38 years.

    youdao

  • 本文探讨了影响煤柱稳定性因素提出采用锚杆支护加固煤柱减小煤柱尺寸提高房柱式采煤回采技术途径

    The factors affecting coal pillar stability are discussed, and the technical way reducing coal pillar size and enhancing recovery ratio is put forward by means of rock bolting.

    youdao

  • 本文研究减小煤柱尺寸提高房柱式采煤回采具有明显理论指导意义,对解决我国生产矿区面临的不规则区段煤层开采问题具有实际意义

    These studies have evident theoretical significance to decrease coal pillar size and enhance recovery ratio, and practical importance to solve the problems of irregular seam mining in our country.

    youdao

  • 采煤方法巷道布置阶段顶煤高度以及回采工艺进行了研究形成柱式顶煤开采技术

    The paper studied the gateway layout, the sectional top coal height and the coal mining technology of the coal mining method. Then the gateway and pillar top coal caving technology was developed.

    youdao

  • 采煤方法巷道布置阶段顶煤高度以及回采工艺进行了研究形成柱式顶煤开采技术

    The paper studied the gateway layout, the sectional top coal height and the coal mining technology of the coal mining method. Then the gateway and pillar top coal caving technology was developed.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定