• 该项目回收期预计约为5.75年。

    The payback period for the project is expected to be about 5.75 years.

    youdao

  • 地下水源热泵;节能性;经济性;回收期。

    Ground water heat pump; Energy-efficiency; Cost-effective; Payback period.

    youdao

  • 非折现的方法有回收期法和会计收益率法。

    Non-discounting methods includes payback period and accounting rate of return.

    youdao

  • 回收期是指收回最初现金投入所需要的年数。

    The payback period is the number of years needed to recover the initial cash outlay.

    youdao

  • 同时分析了变流量运行时附加设备的回收期。

    It also calculates the recycling period of the auxiliary equipment for the variable flow operation.

    youdao

  • 如果项目各年的现金流量是均衡的,可用以下公式计算回收期。

    When the cash flows of a project are assumed to be even, the following formula Can be used to compute its payback period.

    youdao

  • 在新罕布什尔州商业区域经营,这种应用的回收期估计大约为三年。

    The payback period for this application is estimated to be around three years for this New Hampshire area business.

    youdao

  • 结合工程实例,采用逐月分析法对该技术实施后的节电率、回收期进行了计算。

    The rate of power saving and payback period were calculated with the analytical method of month by month.

    youdao

  • Break-Even: 回收期:投资额等于净收入的时间点(以月为单位);

    Payback: the point of time where an investment equals its net sales (in months);

    youdao

  • 用回收期法计算出常州快速公交项目回收期为14.88年,已接近项目的运营时间。

    By using the recovery period method, the investment recovery period for Changzhou's BRT is calculated at 14.88 years, which is close to its actual operation period.

    youdao

  • 文章从经济性角度(回收期)分析了天然气和电力价格对冷热电联供系统推广应用的影响。

    The effect of natural gas price and electric power price on the economics (payback period) of the combined cold, heat and power system is analyzed in this work.

    youdao

  • 房地产行业是一个典型的资金密集型行业,具有初期资金投入量大、回收期长、变现能力差的特点。

    Real-estate is an industry of intensive capital with features that initial high investments, long circle of funds, bad liquidity.

    youdao

  • 然而,这一方法有两个缺点:(1)它忽略了货币时间价值(2)它忽略了项目回收期以后的经营业绩。

    However, this method has two shortcomings: (1) it ignores the time value of money and (2) it ignores the performance of the investments beyond the payback period.

    youdao

  • 通过提高过程稳定性和产品质量一致性,ExpertOptimizer降低了工厂的运作成本,而回收期仅用了四个月。

    By increasing in process stability and consistent product quality, Expert Optimizer lowers the plant's operating costs for a payback time of just four months.

    youdao

  • 财务净现值、内部收益率、动态投资回收期等是房地产投资的动态财务评价指标,它考虑了资金的时间价值,从项目的全寿命期考虑,比较合理和准确。

    They concern about the timing value of the investment while considering the whole process of the project so that are reasonable as well as accurate.

    youdao

  • 财务净现值、内部收益率、动态投资回收期等是房地产投资的动态财务评价指标,它考虑了资金的时间价值,从项目的全寿命期考虑,比较合理和准确。

    They concern about the timing value of the investment while considering the whole process of the project so that are reasonable as well as accurate.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定