装置包括热力塑型腰部定位带和两侧D型环组合而成可固定工作人员位置,给予后撑保护。
It includes thermoplastic positioning waist harness and D-style collars on both sides, and is able to fix user's position, and provide back brace protection.
你在训练后做俯卧撑。
我真的很感谢格雷厄姆教练对我所做的一切,虽然那时训练后做那么多俯卧撑并不好受。
I really felt thankful to Coach Graham for what he had done to me, though it surely didn't feel good at that time to do so many push-ups after practice.
“天如此之晚,你们会出事的,”当在操场做了十个俯卧撑后,朋友告诫他。
“You need to be punished for being so late, ” said Teng De’s friends who met them there. They made him do ten push-ups in the school field.
结果表明:对蒙脱石柱撑改性后能显著提高其吸附性能。
The result shows that after pillaring modified, the adsorption capacity can be improved obviously.
村头村尾各有三座八字撑的石板桥,以及后造的水泥桥将村庄连成一个整体。
Village end of the village have three eight-character support of the stone bridge, and after the cement bridge made of the village even as a whole.
天然膨润土进行酸化处理后,对其进行无机、有机和无机有机柱撑,制备出改性膨润土。
A modified bentonite was prepared, after the natural bentonite had been treated by acidizing, inorganic, organic, inorganic and organic pillar bearing process.
实践证明,采用竖向斜撑后,可以降低重力式挡土墙围护造价,而且提高了围护结构抗倾覆可靠性。
It has been proved by practice that, compared with gravity retaining wall without diagonal bracing, the bracing can reduce the cost of gravity retaining wall greatly while enhancing the reliability.
简述类水滑石化合物的合成方法,并对以类水滑石化合物为前驱体的柱撑水滑石及将其焙烧后的复合氧化物的性质和催化应用进行了综述。
The paper describes the preparation methods of hydrotalcite like compounds (HTLcs), the properties and catalytic application of pillared hydrotalcite and the mixed oxides formed by HTLcs calcination.
与聚对苯撑二甲基聚合物相比引入乙酰基后聚合物的溶解性、介电常数和损耗因子均有所提高。
The solubility, dielectric constant, and dissipation factor of the polymer were improved alter acetyl substitution of poly (p-xylylene).
当蹄铁匠把马的后蹄向前放在蹄撑上时,让你的马稍微低一点头;
When the farrier brings the horse's hind leg forward in the hoof stand, let the horse lower his head somewhat;
对于连墙杆、长水平杆、剪刀撑,必须在脚手架拆卸到相关跨门架后,方可拆除。
For even the wall bar, long horizontal pole, scissors, you must remove the scaffolding to the relevant inter-mast only after the demolition.
对于连墙杆、长水平杆、剪刀撑,必须在脚手架拆卸到相关跨门架后,方可拆除。
For even the wall bar, long horizontal pole, scissors, you must remove the scaffolding to the relevant inter-mast only after the demolition.
应用推荐