吊块及主吊梁的安装是某型号卫星整星吊具安装中的关键环节。
The fixing of davit and primary lifting beam is the key for assembling the hoisting tool of satellite.
由于板型吊梁形状不规则,传统方法不能求出其令人信服的应力值。
The reliable stress solution of a plate type hanging beam can not be got by traditional calculating method because of its irregular form.
悬臂吊梁的翼缘板和腹板在弯曲时因板边互相嵌固,对截面变形有约束作用。
Cantilever crane beam flange web in bending due to board edge are mutually embedded, a restriction on the cross section deformation.
该措施改变传力受力体系,由新设置柱顶的组合钢梁承担单轨吊梁传来的荷载,满足生产工艺和使用安全的要求。
This method changes load system, and the composite steel beam set on column top bears loads transferred by monorail hanging beam. This method meet technology and safety requirement.
箱形梁是集装箱吊具的重要受力部件,对焊接质量要求高。
The box beam was one of the most important stress parts of the crane which required high quality butt weld.
跨缆吊机是悬索桥钢箱梁桥面单元提升安装的专用设备,主要有卷扬机提升式和液压提升式两种形式。
The deck erection gantry is a specialized equipment for erection of suspension bridge deck segments, it has mainly two forms of winch type and hydraulic lifting type.
详细阐述了预制箱梁海上新的吊装工艺和控制方法,包括吊具设计、浮吊改造、运输驳改造。
The advanced hoisting technique and control method of prefabricated box girder over sea including spreader gear design, floating crane improvement and transport barge have been expounded in details.
钩子上挂有部件的吊运车(156)移动到延伸超过涡轮机的主梁(128)的后部。
The trolley (156) with the component on the hook is moved to the aft portion of the main beam (128), which extends beyond the turbine.
钩子上挂有部件的吊运车(156)移动到延伸超过涡轮机的主梁(128)的后部。
The trolley (156) with the component on the hook is moved to the aft portion of the main beam (128), which extends beyond the turbine.
应用推荐