该措施改变传力受力体系,由新设置柱顶的组合钢梁承担单轨吊梁传来的荷载,满足生产工艺和使用安全的要求。
This method changes load system, and the composite steel beam set on column top bears loads transferred by monorail hanging beam. This method meet technology and safety requirement.
该措施改变传力受力体系,由新设置柱顶的组合钢梁承担单轨吊梁传来的荷载,满足生产工艺和使用安全的要求。
This method changes load system, and the composite steel beam set on column top bears loads transferred by monorail hanging beam. This method meet technology and safety requirement.