• 并行工程环境上游产品设计活动下游过程设计活动之间重叠缩短产品开发过程持续时间

    In concurrent engineering, the overlap between the upstream product design activity and the downstream process design activity can shorten the duration of the product development process.

    youdao

  • 并行工程环境上游产品设计活动下游过程设计活动之间重叠缩短产品开发过程持续时间

    In concurrent engineering, the overlap between the upstream product design activity and the downstream process design activity can shorten the duration of the product development process.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定