该发展区的前期基础设施的详细设计已展开,工程可望于二零零一年年中完成,配合科学园第I期的运作。
The detailed design of the advance infrastructure has begun and advance infrastructural work is scheduled for completion in mid-2001 to tie in with the operation of Science Park Phase I.
该发展区的前期基础设施的详细设计已展开,工程可望于二零零一年年中完成,配合科学园第I期的运作。
The detailed design of the advance infrastructure has begun and advance infrastructural work is scheduled for completion in mid-2001 to tie in with the operation of Science Park Phase I.
应用推荐