• 富水岩溶隧道施工主要难题反坡排水,快速有效地排除反坡施工地段积水,对隧道的施工组织现场管理影响重大。

    Drainage in a reverse slope is the primary problem in the construction of a tunnel in a reverse-slope stratum with abundant water.

    youdao

  • 本文对于反坡两种情况,根据上、下层动量方程能量方程分析了两液体的内水流动现象,研究并得出了不同流动情况发生内水跃的条件。

    According to momentum equation and energy equation, the flow phenomena of the internal hydraulic jumps were analysesed for stratified flows in a channel with slop down or slop up.

    youdao

  • 滤作用:用于河流公路铁路机场路基,挡土墙回填土,边岩土工程提高稳定性。

    Filtrate: it can strengthen in geotechnical engineering such as riverbank dam highroad railway roadbed of airport etc.

    youdao

  • 通过含有结构面的岩体应力位移以及屈服区的分布特点讨论了稳定性问题

    By using distribution features of stresses, displacements, and yield zones in rock mass, the stability problem of anti inclined slope is discussed.

    youdao

  • 岩层厚度影响稳定性重要因素,岩层倾角倾边的变形影响不大。

    The stability of counter-tilt slopes does not rest on terrane obliquity but on strength and thickness of terrane interface.

    youdao

  • 对该水电站坝址区陡立倾板状结构岩体而言,纵向河谷地形特征,使坝址两岸大范围发育倾倒变形

    Steep and antithetic platy structure of rock mass and geomorphology of the longitudinal valley in the dam site area cause wide-range toppling deformation on the cross-strait slope.

    youdao

  • 针对堤坝抗滑稳定措施应用理论分析、比较平台放缓稳定效果。

    With respect to the anti-slide resistance measures of embankment on soft clay ground, loading berm method and decrease the slope of the embankment are compared using plastic flow theory.

    youdao

  • 根据相似理论建立地质力学模型研究层状岩体变形破坏机制

    Based on simulation theory, a geologic mechanics model is established and used for research on deformation and damage mechanism of anti-dip layered rock slop.

    youdao

  • 巨型桁架结构要求,是为了重力形形成开阔区域

    In order to achieve the spacious open area with anti-gravity slope shape, mega truss structure required.

    youdao

  • 各种工况下渗流溢出附近相对于整个坝体其它部位易于发生渗透破坏做好初期下游保护

    Compared with with other part, the area near overflow point could be more easily destructed. Therefore, the filter protection to the downstream of the primary dam should be done early.

    youdao

  • 加强地基其他建筑物连接合理布置排水设施避免事故的发生。

    Connection between dam, foundation, bank slopes and other structures has to be strengthened, and drainage and anti-filtering facilities have to be properly arranged to avoid accident mentioned above.

    youdao

  • 通过工程实例总结资料对比可用性强,并快速破坏模式分析提供了科学依据。

    Through contrast with the practical engineering case, the obtained results were shown to be applicable as a quick analysis method for failure mode of toppling rock slope.

    youdao

  • 通过不同模型对应同一点位移矢量层状倾岩条件进行了界定分析

    Using the grey theory, this paper makes a treatment of the monitoring data of landslide displacement) and finds out the grey displacement vector angle.

    youdao

  • 作为一个具体不稳定倾层岩质边滑动不同,失效机理尚未完全阐明。

    As a specific instability of rock slope, an antidip stratified rock slope is different from the sliding one, and the failure mechanism has not been clarified yet.

    youdao

  • 作为一个具体不稳定倾层岩质边滑动不同,失效机理尚未完全阐明。

    As a specific instability of rock slope, an antidip stratified rock slope is different from the sliding one, and the failure mechanism has not been clarified yet.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定