泥河水库是一座大型平原水库,主副坝长度总计6160。
With the length of 6160m of the main and secondary earth dam, Nihe is a large reservoir.
江苏沙河抽水蓄能电站上水库主、副坝为混凝土面板堆石坝。
In Jiangsu Shahe Pumped-storage Power Plant, both main dam and auxiliary dam of upper reservoir are rockfill dam with concrete slab.
查龙电站面板堆石坝坝体及沙砾石副坝填筑体按不同填筑区填筑沙砾石料。
Sand and gravel are filled in different zones in embankment dam with concrete face slab and auxiliary embankment dam at Chalong Hydropower Station.
茅坪溪防护坝是三峡工程的副坝,也是目前中国最高的沥青混凝土心墙坝。
Maopingxi high rockfill dam is the accessorial dam of Three Gorges Project (TGP), which is also the highest rockfill dam with asphalt concrete core in China.
五座副坝分别在北白岩、走马庄、南石骆驼、西石骆驼、九松山等地,总长2592米。
Secondary 5, respectively, in the North Shiraiwa, cursory Zhuang, Southern rock Camel, West Camel stone, nine Matsuyama and other places, with a total length 2592 meters.
通过现场碾压试验,确定上库主副坝各种填筑材料达到设计指标所需的各项碾压参数指标。
All the targets for roller compaction parameters of filling materials for the main dam and associated DAMS of the upper reservoir were determined through in situ roller compaction tests.
介绍了两种情况下,官家冲副坝的监测成果及分析,认为该坝应该与主体工程同步进行监测。
The monitoring results of Guanjiachong auxiliary dam are analyzed; and we think that it should be safety monitoring with intersubjective project in-phase for long.
在收集工程地质勘察资料的基础上,对该申村水库副坝坝体质量及副坝段主要工程地质问题进行了评析。
Based on collecting the data of the engineering geological exploration, this paper comments on the quality and main engineering geological problems of the subsidiary dam of Shencun Reservoir.
黄壁庄水库副坝防渗心墙加固工程所需高性能混凝土,要求和易性好、早期强度低、后期强度高、抗渗性能好、低弹模和高抗拉强度。
The high performance concrete for core wall of earth dam must be good workability, low early strength, high final strength, high seepage resistance, low elasticity modulus and high tensile strength.
根据黄壁庄水库副坝防渗墙的施工实践,分析了这些事故发生的原因,并总结了预防措施以及发生事故后的处理方法,这对今后混凝土防渗墙的施工是个借鉴。
This article bases on practice of building seepage prevention wall in secondary dam of Huangbizhuang reservoir, analyses the causes of the accident, and summarizes precautionary and treatment methods.
工程总体由首部枢纽、引水渠、前池、压力钢管、主副厂房、尾水渠等建筑物组成,采用建坝和新开一段明渠的引水方式。
The engineering is made up with head hinge, diversion canal, fore bay, steel penstock, lord factory building, and the tail channel.
工程总体由首部枢纽、引水渠、前池、压力钢管、主副厂房、尾水渠等建筑物组成,采用建坝和新开一段明渠的引水方式。
The engineering is made up with head hinge, diversion canal, fore bay, steel penstock, lord factory building, and the tail channel.
应用推荐