提出线路的电气介数并将其用于电力系统关键线路识别。
Electric betweenness and its application in line identification in the power system is presented.
介绍了一种确定网络图关键线路的新方法——结点时差法。
This paper introduces a new method of determining the critical path of the network chart-node slack method.
关键线路场景剧本随着开发的进行,会被迭代式地加入更多的细节。
Key path scenarios are iteratively refined along with the design as more and more detail is developed.
本文阐述了用动态规划法求解网络技术组织流水施工中的关键线路方法;
This article describes the process of solving the key way problem with developing programme on the organization of building construction by means of network technology.
基于对模糊网络计算方法的研究,提出了新的网络参数计算和关键线路判断方法。
Based on the study of calculating approaches of fuzzy network, this paper puts forward a new method to calculate the parameters and determine the critical path of fuzzy network planning.
三板溪工程导流洞与大坝施工以及水库初期蓄水是控制首台机组发电工期的关键线路。
The critical path controlling the first power generation of Sanbanxi Hydropower Station is the construction of the diversion tunnel and dam as well as the initial filling of the reservoir.
该方法只需计算出结点最早开始时间和最迟结束时间,便可确定出网络图的关键线路。
This method only needs computing the earliest start -time and the lastest finish-time of the node. Thus you work it out.
工作的总时差是工作的最主要时间参数之一,是网络图中关键工作和关键线路的判别依据。
The total float time is one of the important time parameters for a working task, and also is the basis for ascertaining critical work and critical paths in network planning.
本文以关键线路法为基础,根据图论理论,给出一种支路节点压力通风网络调节计算方法。
In this paper, based on CPM method, a regulating and calculating method of pressure is given on a branch junction head in the mine ventilation network in accordance with graphic theory.
这些模型可以被设计者用于情境中和关键线路场景剧本中,来验证所设计设备的外形和形式。
These models should be employed by designers in context and key path scenarios to validate proposed form factors.
模板工序在许多情况下是施工网络图中的关键线路,模板工艺的改进常常可以加快施工进度。
Template processes in many cases network diagram of the construction of the key lines, Process Improvement template can often speed up the construction schedule.
就时标网络计划在工程中如何确定关键线路、分析工作时间参数、进行网络计划的控制等进行阐述。
This paper analyzes the time-scaled network plan applied to confirm critical path, gain time factors, control network plan and so on.
工作总时差是工作最主要的基本时间参数之一,其大小是网络图中关键工作和关键线路的判别依据。
The basic principle of total time difference is analyzed, and a new thought of weight earned value is put forward.
新方法将L-R三角模糊数引入到网络时间参数计算,并且采用模糊数大小排序的方法确定关键线路。
The new method quantifies the time parameters with L-R triangular fuzzy number, and identifies the critical path through ranking method of fuzzy number.
本文主要介绍网络计划中模糊理论的运用及时间参数作为模糊变量的计算方法和模糊网络关键线路的确定。
In this text, it mainly introduces the application of the fuzzy theory in network planning, and the calculation method of the fuzzy time-parameter, confirmation of the fuzzy "critical path" (CP).
网络计划技术是一种制定计划和对项目进行管理的方法,最常用的即是关键线路法CPM和计划评审技术PERT。
The network planning technique is a kind of method formulating plans and project management execution. Critical path method (CPM) and Program Evaluation and Review Technique (PERT) are commonly used.
并提出解决问题的三种具体措施,从概率论与数理统计的角度,对关键线路和关键工作进行了重新定义和确定的方法。
According to the viewpoints of the probability and mathematical statistics, critical duration, critical activity and critical line are re - defined, and particular method is put forward for it.
该方法在综合考虑课程衔接关系、时间参数、关键线路、关键课程及相关约束的基础上,制定了灵活的专业课程排课计划。
The method takes courses relation, time parameters, critical paths, critical courses and relative situation into account, then gives some flexible courses schemes.
根据《细胞》杂志所说,这种情绪的涌现都是扁桃体的错,因为这个大脑恐惧线路的关键的小东西可以感知窒息状态并触发恐惧情绪。
Well, a new study in the journal Cell says you can thank your amygdala for that. Because this key member of the brain’s fear circuitry can directly sense suffocation, and trigger feelings of terror.
固定线路在许多领域仍然起着关键的作用。
In many ways the landline network is still an essential utility.
本文进行了线路原理分析,并给出了关键技术参数的选取原则及计算方法。
It also analyses the principle of circuit and shows the way how to count the key technical parameters.
战略技巧是关键,要想顺利通过变幻无常的赤道无风带,要选对正确的线路和清风。
Tactics will be key, pick the right route and breeze through the fickle Doldrums.
800千伏特高压直流变压器是实现远距离、大容量输电的特高压输电线路的关键设备。
The 800 kV UHVDC transformer is a key component of ultrahigh-voltage power links that deliver large amounts of electricity over very long distances.
输电线路可靠性运行的关键是悬式绝缘子的质量。
The key to safe operation of electrical transmission line is the quality of suspension insulator.
正确认识汉中旅游资源的特色和优势,是客源市场定位的基础,也是合理进行线路布局和实现旅游资源优化配置的关键。
A better understanding of the features and the superiority is the base for marketing visitors, and the key to a reasonable layout of the touring lines and a rational use of the resources.
既有桥台加固是控制工期、确保线路正常运营的关键。
Consolidation of existing abutments is key to ensuring construction period and normal operation of railway line.
E1传输线路在我国通信网络系统中具有广泛的应用,对其传输性能的分析与检测成为维持网络正常运行的关键因素。
E1 transmission lines are widely used in communication network systems in our country. Testing and analyzing performance of E1 line become a key factor for network maintenance.
高压长线路实现短路法融冰的关键是获得大容量的融冰电源。
The key to realize ice-melting of long HV transmission lines by short-circuit method is to obtain a huge ice-melting power supply.
试验线路的确定是行驶工况调查的关键环节。
Confirming test routes is crucial step of driving investigation.
试验线路的确定是行驶工况调查的关键环节。
Confirming test routes is crucial step of driving investigation.