作业成本法与传统的成本计算法的根本区别是对间接资源的分配标准不同,即以成本动因作为标准。
The difference between Activitybased Costing and the traditional costing calculation lies in the allotment criteria of the resource, i. e, it regards cost drive as the allotment criterion.
作业成本法与传统的成本计算法的根本区别是对间接资源的分配标准不同,即以成本动因作为标准。
The difference between Activitybased Costing and the traditional costing calculation lies in the allotment criteria of the resource, i. e, it regards cost drive as the allotment criterion.
应用推荐