完善的技术交底为良好施工质量提供保障。
The complete technical disclosure provides guarantee for good construction quality.
组织承包人与设计单位进行图纸会审和设计交底。
Organize for the Contractor and the Designer to jointly examine the Drawings and deliver the design.
施工交底:施工技术交底,安全交底,环境交底。
Construction Disclosures: Technical disclosure, safety disclosure, environmental disclosure.
今天早上米奇跟我开了个会,他给我交底说我需要在工作中更加主动些。
I had my meeting with Mitch this morning and his bottom line is that he thinks I need to show more initiative. He thinks that I need to start being more creative.
施工准备:施工前的物质准备,技术人员的调配,现场交底,办理入场手续。
Construction preparation: pre-construction material prepared for the deployment of technical personnel, on-site construction, procedures for admission.
组织施工人员进行技术交底,使作业人员明确施工的方法和质量要求,并做好交底记录。
Organize construction employees to conduct technical disclosure in order to make them known the construction method and quality requirement. Make good disclosure record.
负责检测工程技术交底工作,指导和监督检测人员从事检测工作,及时向质量负责人报告工作;
In charge of the technical handover of the testing, guide and supervise the inspectors to conduct the test and report to Quality Director in time.
在施工中进行各工序书面技术交底,参加各工序的检验和工程验收,对工程的分部分项工程进行质量检查和评定工作。
Written technical disclosure of each process in the construction, to participate in the inspection and project acceptance process, quality inspection and assessment of sub projects.
在施工中进行各工序书面技术交底,参加各工序的检验和工程验收,对工程的分部分项工程进行质量检查和评定工作。
Written technical disclosure of each process in the construction, to participate in the inspection and project acceptance process, quality inspection and assessment of sub projects.
应用推荐