• 邹县发电厂四期工程系统状况进行了介绍确定蒸汽系统主给水系统管道设计参数,选择了管道材料

    Project and system situation in Zouxian Power Plant were introduced, and the piping design parameters and the piping material of main steam system and main feed water system were determined.

    youdao

  • 邹县发电厂四期工程系统状况进行了介绍确定蒸汽系统主给水系统管道设计参数,选择了管道材料

    Project and system situation in Zouxian Power Plant were introduced, and the piping design parameters and the piping material of main steam system and main feed water system were determined.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定