• 如果连接蒸汽热水器锅炉个,则每个锅炉热水器之间管路上应该安装一个回阀

    When more than one boiler is connected to the main steam header, a stop check valve should be installed in the pipeline between each boiler and the header.

    youdao

  • 这种回阀应该模块化的,并且应该采用一个O形环密封上。

    The check valves shall be modular and shall seal to the main valve body by the use of an O-ring.

    youdao

  • 这种回阀应该模块化的,并且应该采用一个O形环密封上。

    The check valves shall be modular and shall seal to the main valve body by the use of an O-ring.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定