挤扩多分支承力盘混凝土灌注桩是一种新型的变截面混凝土灌注桩,由主桩、分支桩、分支和承力盘组成。
The compacted multi-branch bearing disk concrete bored pile is a new type of concrete pile with varied sections, which is composed of the main pile, branch pile, branch support and the bearing disk.
在此基础上,进一步对主桩架结构包括支柱、顶架平台、支座等进行了强度校核验算,并对桩架的运行安全提出了建议。
The main structures with strength checking include the stanchion, the upper platform and the base seat. The suggestions about the safety of the pile driving frame are put forward.
结合工程实际,主塔承台采用圆形钢板桩围堰施工,圆满完成了承台的施工。
In light of engineering practice, a round steel sheet pile cofferdam was used in the main tower caps and the construction of pile cap was successfully completed.
利用主解系数等方法导出了桩轴向、横向及扭转刚度系数的通用算法并用于桩基作为空间结构的矩阵分析。
The stiffness coefficients of piles have been calculated by numerical method and duly employed in the matrix analysis of pile foundations as space structures.
重点介绍了位于长江主航道上武汉长江二桥斜拉桥主塔墩基础双壁钢围堰及钻孔桩的施工。
Construction of bored piles in steel cofferdam as pylon foundations in main channel for the SecondChangjiang River Bridge in Wuhan is emphatically recounted.
主塔墩基础采用钻孔灌注桩群桩基础,采用钻孔平台作为桩基施工临时设施。
The bored pile-group is used for the foundation of the main pylon piers and a drilling platform will be used as temporary facilities for construction of the pile foundation.
主塔墩基础采用钻孔灌注桩群桩基础,采用钻孔平台作为桩基施工临时设施。
The bored pile-group is used for the foundation of the main pylon piers and a drilling platform will be used as temporary facilities for construction of the pile foundation.
应用推荐