• 广东东莞东江大桥主桥是一座三主桁双层桥面刚性悬索加劲钢桁梁,这是一种较为新颖的桥梁结构形式,它同时具备悬索桥与钢桁架桥的优点。

    The main bridge of Dongguan Dongjiang bridge is a three main trusses steel bridge with rigid cable, is a new double-deck bridge structural style.

    youdao

  • 主梁采用钢管混凝土桁架与钢筋混凝土板组合梁。

    The main beam adopts the CFST truss and reinforced concrete deck slab.

    youdao

  • 主拱为桁架式双拱肋,钢管拱纵向分13段制造,采用无支架缆索吊机安装、钢绞线斜拉扣挂施工。

    The steel pipe arch was manufactured in 13 segments vertically, erected by cable crane without support and clasped by diagonal tension steel strand.

    youdao

  • 重点介绍了利用桁架浇筑排架柱主梁及平台的设计和施工,可供同类型工程参考。

    Construction design and construction of trestle main beam and platform concrete placement by using steel truss are mainly described for reference to the similar projects.

    youdao

  • 劲性骨架为钢管桁架结构,转体施工,之后,通过内填和外包混凝土构成单箱单室箱形截面的主拱结构。

    The stiff skeleton is a steel truss structure, which turns into a single cell and single box section of the main arch structure by filling and outsourcing concrete after swivel construction.

    youdao

  • 结果表明,转换钢桁架产生局部振型,形成结构薄弱环节,结构主振周期对应着地震力贡献最大的振型;

    It is indicated that some modes corresponding to the maximum of earthquake force are principal, but others produced by steel trusses are local because of the weakness of theirs joints.

    youdao

  • 主站房采用巨型空间桁架结构体系,主站房屋盖南北连续主跨280米,最大跨距81米,创造出体现结构力学之美的轻盈屋盖,充满动感和未来感。

    The roof of mainstationroom spans 280 meters from south to north and the maximum outreach is 81 meters by using giant space truss work system.

    youdao

  • 主站房采用巨型空间桁架结构体系,主站房屋盖南北连续主跨280米,最大跨距81米,创造出体现结构力学之美的轻盈屋盖,充满动感和未来感。

    The roof of mainstationroom spans 280 meters from south to north and the maximum outreach is 81 meters by using giant space truss work system.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定