• The hydraulic measure is an important component of automatic system of YRDP.

    力量引黄工程自动化系统重要组成部分。

    youdao

  • In this paper, the construction experience of PCCP in the Connection Works of YRDP is summarized.

    文中总结了万家寨引黄联接工程中的PCCP管道施工经验

    youdao

  • The seepage cause in the adit and shaft of the third-stage pumping station of the general main line in YRDP is analyzed.

    文中针对万家寨引黄工程输水隧洞及泵站平洞竖井存在渗漏原因进行分析研究。

    youdao

  • The operating and scheduling system of Wanjiazhai Yellow River Diversion Project (YRDP) is a big complex diversion system.

    万家寨引黄工程运行调度系统一个大型复杂引水系统。

    youdao

  • The water diverted from the Yellow River by the YRDP is to afford water to Taiyuan City in the year 2001 for industry and urban residents.

    万家寨引黄工程2001将通水太原太原的城市生活工业供水

    youdao

  • In the paper, the construction technology of buried culvert in No. 2 tunnel in Wanjiazhai YRDP using well-point to discharge ground water, is adopted.

    文中介绍万家寨引黄工程南干线2施工方法采用了“井点法”排除地下水。

    youdao

  • Shanxi Wanjiazhai Yellow River Diversion Project (the YRDP) will mainly supply water for the industry in Datong City, Pingshuo District and Taiyuan City.

    万家寨引黄工程主要大同市、平太原市提供工业用水

    youdao

  • This paper introduces excavation of the unfavorable geological section of tunnel project of Wanjiazhai YRDP, temporary brace and construction of concrete lining.

    文中介绍了万家寨引黄隧洞工程不良地质施工中的开挖,临时支护混凝土衬砌等

    youdao

  • Wild animals along the Yellow River Diversion Project (YRDP) line have been investigated. There are wild animals including 16 orders, 31 families and 71 species.

    对引黄工程沿线野生动物进行调查,共有陆栖脊椎动物1631、共计71种。

    youdao

  • The exported relief valve with submerged perforated sleeve designed and manufactured by a Japanese company is used in the connecting section of YRDP for the first time in China.

    引黄连接工程引进日本粟本铁工所设计制造淹没多孔套筒国内首次使用

    youdao

  • Using hydraulic model, the writers studied the process and pattern of sediment deposit in high pressure water conveyance pipe of Wanjiazhai YRDP (Yellow River Diversion Project).

    作者采用模型试验方法研究了万家寨引黄工程高压输水管道泥沙淤积过程形态,分析了临界不淤流速及管道淤堵等问题。

    youdao

  • The general trunk secondary pump station of Wanjiazhai YRDP is the underground workhouse pump station, and the gas system is the important component of the assistant design of the pump station.

    万家寨引黄工程二级泵站地下式厂房泵站系统泵站辅助设计重要组成部分

    youdao

  • The general trunk secondary pump station of Wanjiazhai YRDP is the underground workhouse pump station, and the gas system is the important component of the assistant design of the pump station.

    万家寨引黄工程二级泵站地下式厂房泵站系统泵站辅助设计重要组成部分

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定