The hydraulic measure is an important component of automatic system of YRDP.
水力量测是引黄工程自动化系统的重要组成部分。
In this paper, the construction experience of PCCP in the Connection Works of YRDP is summarized.
文中总结了万家寨引黄联接段工程中的PCCP管道施工经验。
The seepage cause in the adit and shaft of the third-stage pumping station of the general main line in YRDP is analyzed.
文中针对万家寨引黄工程输水隧洞及泵站平洞竖井存在的渗漏原因进行分析研究。
The operating and scheduling system of Wanjiazhai Yellow River Diversion Project (YRDP) is a big complex diversion system.
万家寨引黄工程运行调度系统是一个大型复杂引水系统。
The water diverted from the Yellow River by the YRDP is to afford water to Taiyuan City in the year 2001 for industry and urban residents.
万家寨引黄工程2001年将通水到太原,为太原的城市生活及工业供水。
In the paper, the construction technology of buried culvert in No. 2 tunnel in Wanjiazhai YRDP using well-point to discharge ground water, is adopted.
文中介绍了万家寨引黄工程南干线2号埋涵的施工方法,采用了“井点法”排除地下水。
Shanxi Wanjiazhai Yellow River Diversion Project (the YRDP) will mainly supply water for the industry in Datong City, Pingshuo District and Taiyuan City.
万家寨引黄工程主要为大同市、平朔区、太原市提供工业用水。
This paper introduces excavation of the unfavorable geological section of tunnel project of Wanjiazhai YRDP, temporary brace and construction of concrete lining.
文中介绍了万家寨引黄隧洞工程不良地质洞段施工中的开挖,临时支护,混凝土衬砌等。
Wild animals along the Yellow River Diversion Project (YRDP) line have been investigated. There are wild animals including 16 orders, 31 families and 71 species.
对引黄工程沿线的野生动物进行了调查,共有陆栖脊椎动物16目、31科、共计71种。
The exported relief valve with submerged perforated sleeve designed and manufactured by a Japanese company is used in the connecting section of YRDP for the first time in China.
由引黄连接段工程引进的日本粟本铁工所设计、制造的淹没式多孔套筒阀,在国内为首次使用。
Using hydraulic model, the writers studied the process and pattern of sediment deposit in high pressure water conveyance pipe of Wanjiazhai YRDP (Yellow River Diversion Project).
作者采用模型试验方法研究了万家寨引黄工程高压输水管道中泥沙的淤积过程、形态,分析了临界不淤流速及管道淤堵等问题。
The general trunk secondary pump station of Wanjiazhai YRDP is the underground workhouse pump station, and the gas system is the important component of the assistant design of the pump station.
万家寨引黄工程总干二级泵站为地下式厂房泵站,气系统是泵站辅助设计中重要的组成部分。
The general trunk secondary pump station of Wanjiazhai YRDP is the underground workhouse pump station, and the gas system is the important component of the assistant design of the pump station.
万家寨引黄工程总干二级泵站为地下式厂房泵站,气系统是泵站辅助设计中重要的组成部分。
应用推荐