• 下一步是生产窗和隔热层,之后是安装预制浴室和厨房模块,最后这个单元被起重机吊起来放置在这座建筑的相应位置上。

    Windows and insulation came next, and then prefabricated bathrooms and kitchen modules were installed. Finally the unit was lifted by crane into position on the building.

    youdao

  • 结合瀑布沟大桥工程实际,详细介绍了无塔架缆索吊机的设计方法和无塔架缆索吊装预制横梁及吊杆的安装技术。

    Based on the practice of Pubugou Large Bridge, the technology of non-tower cable lifting prefabricated transverse beam and rod installation is introduced in detail.

    youdao

  • 该预制块应用在烧结机点火器上,使用寿命可达2 ~3年。

    The service life of the preformed block applied in igniters of sintering machine is 2 ~ 3 years.

    youdao

  • 采用起重机吊装预制梁,具有施工机具简单、易于操作、成本低、工期短、质量安全易于保证等优点。

    Using crane to hoist and construct bridge is characteristic of simple in constructional machines, easy in operation, low in cost, short in construction time, safety and good quality.

    youdao

  • 本文主要介绍预制场布置、运输与安装、架桥机拼装、纵横向移动、安装就位的方法以及安全技术措施等。

    The arrangement, transportation, installation, erecting machine assembly, vertical and horizontal movement and installation methods as well as security technology measures are mainly introduced.

    youdao

  • 拱肋纵向分7段预制,采用无支架缆索吊机安装、钢丝绳斜拉扣挂法施工。

    The arch rib have been fabricated longitudinal by 7 segments, and used the non-support cable crane installation and the steel cable diagonal-tension method.

    youdao

  • 拱肋纵向分7段预制,采用无支架缆索吊机安装、钢丝绳斜拉扣挂法施工。

    The arch rib have been fabricated longitudinal by 7 segments, and used the non-support cable crane installation and the steel cable diagonal-tension method.

    youdao

$firstVoiceSent
- 来自原声例句
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定
小调查
请问您想要如何调整此模块?

感谢您的反馈,我们会尽快进行适当修改!
进来说说原因吧 确定